No Support JavaScript
Main Content Area
:::

Content

Title: Application Procedures for Registration of Product Certification Ch
Date: 2024.02.27
Legislative: 1. Adopted by Bureau of Standards, Metrology and Inspection on 22 December 1999.
2. 7 clauses amended and adopted by Bureau of Standards, Metrology and Inspection on 2 January 2002.
3. 8 clauses amended and promulgated by Bureau of Standards, Metrology and Inspection on 17 May 2005.
4. 9 clauses amended and promulgated by Bureau of Standards, Metrology and Inspection on 16 March 2007.
5. 11 clauses amended and promulgated by Bureau of Standards, Metrology and Inspection on 23 September 2011.
6. 11 clauses amended and promulgated by Bureau of Standards, Metrology and Inspection on 2 October 2017.
7. 11 clauses amended and promulgated by Bureau of Standards, Metrology and Inspection on 30 July 2021.
8. Clauses 3, 6, 11, and Table AP-02 of Clause 2, Table CH-02 of Clause 3, Table CE-01, CE-03 of Clause 4 and Table CE-02 of Clause 7 amended and promulgated by Bureau of Standards, Metrology and Inspection on 9 December 2022.
9. Table RE-01, CH-01 of Clause 3, Table RE-03 of Clause 7 and Table MRA-RE-05, MRA-CE-04, MRA-CE-05 of Clause 9 amended and promulgated by Bureau of Standards, Metrology and Inspection on 27 February 2024.
Content: 1. The term “applicant” refers to a domestic manufacturer or a person who entrusts others to 
manufacture the commodities. For commodities to be imported, an applicant refers to the sales 
agent or importer who has a domicile or business place in Taiwan. Applications for Registration of 
Product Certification (RPC) shall be made in accordance with these Procedures.

2. Application for Registration
(1) An applicant shall submit an application to the Bureau of Standards, Metrology and Inspection 
(BSMI), its branches (the inspection authority) or a commissioned product certification body 
(hereinafter referred to as the CCB).
(2) An applicant shall consult the “List of Attachments for Application for Registration of Product 
Certification” (Form AP-01) in advance.
(3) Documents to be attached to an application include:
a.Basic documents:
(a) An application form (Form AP-02-1) and an electronic file containing the application 
information presented in the format required by the BSMI (downloadable from the BSMI web site). 
Applications made online are exempt from attaching the electronic file.
(b) A copy of the company registration, business registration, factory registration certificate, ID card 
or other equivalent establishment registration documents of the applicant, except those who have 
been registered by the inspection authority or the CCBs without change or whose tax ID number can 
be looked up from the authority’s public website.
b. Conformity assessment documents (where the specific module is applicable):
(a) Module I: A declaration of internal-control (Form AP-03) and the required designated technical 
documents.
(b) Modules II + III: 
(i) A type-test report issued by the inspection authority or a testing laboratory recognized by BSMI;
(ii) A declaration of conformity-to-type (Form AP-04); and
(iii) Related technical documents and information.
(c) Modules II + IV, Modules II + V, or Modules II + VI:
(i) A type-test report issued by the inspection authority or a testing laboratory designated by BSMI;
(ii) A copy of the quality management system (QMS) registration certificate issued by a QMS 
certification body recognized by the BSMI;
(iii) A declaration of conformity-to-type (Form AP-04); and
(iv) Related technical documents and information.
(d) Modules II + VII:
(i) A type-test report issued by the inspection authority or a testing laboratory designated by BSMI;
(ii) A copy of factory inspection report, dated the same year or previous year of the application for 
RPC, issued by the inspection authority or a factory inspection body recognized by BSMI;
(iii) A declaration of conformity-to-type (Form AP-04); and
(iv) Related technical documents and information.
c. There is no requirement for the date of issue of the type-test report mentioned in Clause 2.2.2. 
However, where specific requirements are stated for individual product category, such requirements 
shall apply.
d. Where the certificate holder of the QMS registration certificate as required by Module II+IV or 
II+V is a foreign premise, the certificate shall be issued by foreign QMS certification body 
recognized by BSMI within the same country of that premise or by a domestic QMS certification 
body recognized by BSMI. 
(4) A letter of appointment or power of attorney shall be presented if the RPC application is made 
by a thirty party on its behalf.

3. Acceptance and Review
(1) The inspection authority or CCBs shall check that the documents submitted by the applicant 
conform to the requirements before accepting the application. An application number shall be given 
to each application based on the Coding Rules for Certificate Numbers of the Registration of 
Product Certification Scheme (Form RE-01). An application fee will be charged according to the 
Regulations Governing Fees for Commodity Inspection.
(2) For applications made under the mutual recognition arrangements, an application number shall 
be given based on the Coding Rules for Certificate Numbers of the Recognition of Product 
cortication Scheme( Mutual Recognition Arrangements).
(3) The inspection authority or CCBs shall review the conformity assessment documents submitted 
by the applicant. If deficiencies are discovered in the application documents that can be rectified, 
such as mistakes or incomplete information, a “Notice for Supplementing Documents for 
Application for Registration of Product Certification” (Form CH-01) shall be sent to the applicant to 
rectify the deficiencies in the application documents within two months (no limit for the number of 
Notice to be issued). A “Notice of Non-conformity for Registration of Product Certification” (Form 
CH-02) shall be issued if rectification is not made after the time limit and the case shall be closed. If 
the deficiencies in the documents cannot be rectified, a “Notice of Non-conformity for Registration 
for Product Certification” shall be issued.
(4) Documents that are provided by the applicant in lieu of the type-test reports required in Module 
II of the RPC Scheme in accordance with Paragraph Two of Article 4 of the Regulations Governing 
Registration of Product Certification (hereinafter referred to as the Regulations), such as the Type 
Approval Certificate or CNS Mark Certificate, may be accepted under the following circumstances:
a. The Type Approval Certificate is reviewed to comply with requirements.
b. The date of issue of the test report for use of the CNS Mark is within one year prior to the 
application for RPC.
(5) A certificate submitted by following the requirements stated in Paragraph 3, Article 4 of the 
Regulations and issued by the Parties to the mutual or multilateral recognition arrangements shall be 
regarded as compliance with the conformity assessment procedures of the RPC Scheme. The 
applicant must retain the related technical documents for checks by the inspection authority or 
CCBs in accordance with Article 8 of the Regulations Governing Registration of Product 
Certification.

4. Issuance of RPC Certificate
(1) The RPC Certificates shall be issued by the inspection authority or CCB (Form CE-01、CE-03) 
or printed by the applicant after the product has been reviewed and approved for registration. 
(2) The inspection authority or CCB shall issue the RPC Certificate (Form CE-01) after review of 
the application documents issued by the Parties to the mutual or multilateral recognition 
arrangements.
(3) Upon the issuance of RPC Certificate by the inspection authority or CCB or the grant to the 
applicant to print out their own certificates, the applicant is allowed to use the RPC Mark according 
to the Regulations Governing the Use of Commodity Inspection Mark. The graphic symbol and 
identification number are illustrated in the drawing method (Form RE-02).
(4) Where the commodity inspection mark is announced to be specifically printed by the BSMI, the 
RPC certificate holder (hereinafter referred to as certificate holder) shall make an application for 
obtaining such inspection mark labels by submitting the following documents:
a. An application form for a specific commodity inspection mark and an electronic file containing 
the application information presented in the format required by BSMI (downloadable from BSMI 
web site);
b. A copy of the RPC Certificate; and
c. Related documents and information designated by BSMI.
The specific inspection mark labels will be issued by the inspection authority or CCB in accordance 
with the regulations for the inspection mark upon approval of the application. 

5. Extension of RPC Certificate
(1) An application for extension of the term of validity of the certificate shall be submitted to the 
inspection authority or CCB that issues the original certificate. The application shall be made within 
a period of three months prior to the expiration of the certificate.
(2) Documents required for an extension of the RPC Certificate include
a. A completed application form and an electronic file containing the application information 
presented in the format required by BSMI (downloadable from BSMI web site). Applications made 
online are exempt from attaching the electronic file.
b. The original or copy of RPC certificate;
c. If the inspection standards of the registered commodities are revised, related documents 
demonstrating compliance with the latest inspection regulations promulgated by the BSMI;
d. A declaration of conformity-to-type (Form AP-04); and
e. Other related technical documents and information designated by BSMI.
(3) An extension will be granted for one time only. A new application for RPC is required after the 
expiration of the original certificate.

6. New applications for RPC Certificate
(1) Clause 2 shall apply to such new applications.
(2) Where the commodity and the inspection standards remain the same when a new application is 
made, a valid type-test report and related technical documents, or the original (or copy of) RPC 
certificate may be accepted as the application documents under the circumstance that it had not been 
revoked or rescinded in accordance with Subparagraphs One to Six, Subparagraph Eight, or 
Subparagraph Nine of Article 42 of the Commodity Inspection Act. The inspection authority or 
CCB may, for purpose of verification, request samples to be provided by the applicant.
(3) If the applicant submits the original (or copy of) RPC certificate to make a new application, the 
inspection authority or CCB shall review the type-test report and related technical documents, 
which are deposited in the original file, to review their compliance with the requirements of the 
inspection standards and technical regulations.  

7. Authorization of Registered Products for Customs Clearance
(1) The certificate holder or the party under authorization shall provide the following documents for 
purpose of authorizing others to clear the customs of registered products:
a. A letter of authorization for customs clearance of the registered products (Form AP-05) and an 
electronic file containing the application information presented in the format required by BSMI 
(downloadable from BSMI web site). Applications made online are exempt from attaching the 
electronic file.
b. The original or a copy of RPC certificate;
c. Copies of the business or factory registration certificates or other equivalent documents of the 
company, or the identification card of the person under authorization.
d. Domestically-manufactured commodities are entitled to this clause, except for cases approved by 
the BSMI for special conditions. 
(2) An Import Release Notice of Authorization for Registered Products (Form CE-02) will be issued 
by the inspection authority or CCB and coded in accordance with the “Coding Rules for the Import 
Release Notice of Authorization for Registered Products” (Form RE-03) after the application is 
approved. The Notice shall be used within the validity period of authorization. 
(3) Application for authorization of customs clearance for products certified under the mutual or 
multilateral recognition arrangements shall be coded by following the “Coding Rules for the Import 
Release Notice of Authorization for Registered Products” (Form RE-03) based on their country of 
origin.
(4) Where the certificate holder informs the inspection authority or CCB of termination of 
authorization, the registration of product certification had been revoked or rescinded, or the 
registration certificate had been cancelled in writing. a written notice shall be sent to the authorized 
party on the rescission of related Import Release Notice of Authorization for Registered Products 
issued to him/her.

8. Application for Transfer of RPC Certificates 
(1) Where a certificate holder no longer exists due to a merge with other companies, the other 
companies or the new company may apply for transfer of the RPC certificates of the certificate 
holder by providing the following documents:
a. A completed application form and an electronic file containing the application information 
presented in the format required by BSMI (downloadable from BSMI web site). Applications made 
online are exempt from attaching the electronic file.
b. Copies of the business registration document of the applicant or other equivalent documents; 
c. Copies of the approval document by the competent authority for the merger issued;
d. Copies of the approval document issued by the competent authority concerning the merger and 
dissolution; and
e. The original or copy of RPC certificate to be transferred.
(2) A head office may apply for transfer of RPC certificates of its branch offices of which 
registration had been cancelled by providing the following documents:
a. A completed application form and an electronic file containing the application information 
presented in the format required by BSMI (downloadable from BSMI web site). Applications made 
online are exempt from attaching the electronic file.
b. Documents which can demonstrate the relationship between the head office and the branch 
offices;
c. Copies of the approval document issued by the competent authority concerning the cancellation 
of the registration of the branch offices; and
d. The original or copy of RPC certificate to be transferred.
(3) The applicant shall not be given the same identification number of the certificate holder for its 
new certificate if it has been given its own identification number.
(4) Under the circumstances that the applicant assumes the legal status of the certificate holder, 
which no longer exists due to division of business, acquisition of business or reorganization, the 
applicant may apply to the BSMI for transfer of RPC certificates by submitting an application letter, 
documents demonstrating the relationship between the applicant and the certificate holder, and the 
copies of RPC certificates, or a list of certificates if the amount of certificates to be transferred is 
above 10.

9. Application Procedure for Certification of Conformity under Mutual Recognition Arrangements 
(1) Documents to be attached to an application include:
a. Application Form for Certification of Conformity under Mutual Recognition Arrangements (Form 
MRA-AP-12) and an electronic file containing the application information presented in the format 
required by the BSMI (downloadable from the BSMI web site).
b. A type-test report issued by the inspection authority or a testing laboratory recognized by the 
BSMI.
c. Copies of the business registration document of the company, business or factory, or other 
equivalent documents.
(2) An application number shall be given to each application based on the Coding Rules of the 
Certificate Coding Under Mutual Recognition Arrangements (Form MRA-RE-05) if the application 
documents comply with the requirements. The inspection authority or CCB shall charge an 
application fee according to the Regulations Governing Fees for Commodity Inspection.
(3) The inspection authority or CCB shall issue the Certificate of Conformity (Form MRA-CE-04 or 
05) if registration is granted after review of the application in accordance with the Mutual 
Recognition Arrangements.

10. Payment for Annual Fee
(1) An applicant shall pay the annual fee in order to obtain the RPC certificate. The annual fee of the 
next year shall also be paid if the date of issue is after October first. 
(2) The inspection authority or CCB shall, beginning on October 1 of each year, inform the 
certificate holder to pay the annual fee for next year by November 30 of the following year. A notice 
will be sent to the certificate holder to collect the fees after the due date and payment shall be made 
before December 15.
(3) Where the certificate holders fail to pay the annual fee before December 15, the RPC registration 
shall be revoked in accordance with Subparagraph 7, Article 42 of the Commodity Inspection Act. 
The revocation enters into force on January 1 of the next year.
(4) The certificate holder apply for cancellation of its RPC certificates in accordance with Paragraph 
1, Article 11 of the Regulations, or the certificate has been revoked or rescinded, its annual fees paid 
shall not be refunded, except in the case of overcharged fees or mistakes or when the product is no 
longer subject to mandatory inspection as a result of revisions to the scope.

11. Administration, Changes and Surveillance
(1) Where there are changes to the RPC registered products, such as the name and address of the 
applicant, the name of the person in charge, the CCC code, the production premises, the name and 
type of the product, etc., an application shall be made to the inspection authority or CCB that issues 
the RPC certificate for approval of such changes. Approval letters issued by the competent authority 
for relevant changes or relevant conformity assessment documents (including declaration of 
conformity to type) shall be provided along with the application, where necessary. The declaration 
of conformity to type is not required if the changes are about the name and address of the applicant, 
the name of the person in charge, the CCC code of the product, the QMS CB that issues the ISO 
9001 certificate, the certificate number of ISO 9001 certificate, or the expiry date of ISO 9001 
certificate. Where the changes involve the registered information stated in the RPC certificate, an 
application for replacement of the certificate shall also be made. 
(2) A product manufactured by a non-registered production premise is not a registered product.
(3) Where a certificate holder is a sole proprietorship, a new application for RPC certificate shall be 
made if the name of the person in charge is changed.
(4) Where the registered products are sold to another person and marketed under the name of that 
person, the certificate holder shall submit the “Notification of Sale of Registered RPC Products 
under the Names of Other Persons” (Form AP-11) to report the name and address of the seller to the 
inspection authority or CCB. The inspection authority or CCB shall record the information in 
computer systems for purpose of auditing.
(5) The inspection authority or CCB shall suspend approval of application made by the certificate 
holder for cancellation of its RPC certificates if the products did not comply with the inspection 
standards, except that the certificate holder has obtained a new type test report. 
(6) The inspection authority or CCB shall ensure that the ISO 9001 certificate is valid when 
approving applications or processing applications for adding series of products, extension of 
certificates or changes to the registered information.
(7) Under any of the following circumstances, the certificate holder shall apply for a change of the 
QMS certification or factory inspection report by submitting a valid one within three months after 
notified by the inspection authority or CCB. except for special circumstances:
a. The QMS certification has been suspended, terminated or its relevant scope is reduced.
b. The relevant scope of the factory inspection report has been reduced.
c. The manufacturer fails to cooperate with factory inspection bodies to receive follow-up 
inspection.
d. The results of the follow-up factory inspection are determined to be non-compliant.
e. No accreditation logo of the accreditation body is shown on the QMS certificate or factory 
inspection report .
Attachments: