Chapter 1 General Provisions
Article 1
This Act is enacted for the purpose of developing effectively managing the national electric power
resources, regulating electricity supply, facilitating the transformation of energy production,
reducing the carbon emission, promoting the supply diversification of the electricity industry, fair
competition and reasonable business practice, protecting the interest of the users, and improving the
welfare of the society, so as to fulfill the goal of sustainable development of the country.
Article 2
Definitions
Definitions of terms used in the Act:
1. “Electricity Enterprise” means the corporations involved in the electric power generation,
transmission and distribution, and retailing as sanctioned in this Act.
2. “Electricity Generating Enterprise” means a non-public utility that operates major power
generation equipment and engages in the generating and selling of electricity, including the
renewable-energy-based electricity generating enterprise.
3. “Renewable-Energy-Based Electricity Generating Enterprise” means an electricity generating
enterprise that operates power generation equipment based on renewable energy sources, as
prescribed in Article 3 of the Renewable Energy Development Act, and engages in selling
electricity.
4. “Electricity Transmission and Distribution Enterprise” means a public utility that installs the
power grids all over the country to wheel the electric power.
5. “Electricity Retailing Enterprise” means electricity retailing utility corporations and
renewable-energy-based electricity retailing corporations.
6. “Electricity Retailing Utility Enterprise” means a public utility that purchases electricity for the
purpose of reselling it to the users.
7. “Renewable-Energy-Based Electricity Retailing Enterprise” means a non-public utility that
purchases electricity generated from renewable energy for the purpose of reselling it to the users.
8. “Electricity Facilities” means the infrastructure required for the generation, transmission and
distribution of electricity.
9. “Major Power Generation Equipment” means a motor, a power generator or other required
infrastructure for energy conversion.
10. “Self-Use Power Generation Equipment” means the major power generating facilities installed
by enterprises other than the electricity corporations, groups or individuals (natural persons) to
generate power for private use.
11. “Renewable Energy” means the renewable energy as prescribed in Article 3 of the Renewable
Energy Development Act or power generated from sustainable sources as approved and recognized
by the central competent authority.
12. “User’s Electricity Device” means any conduits, transformers, switches and other equipment
installed by users for the conveyance of electricity.
13. “Renewable-Energy-Based Power Generation Equipment” means the power generating
infrastructure approved with official licenses issued by the central competent authority as prescribed
in Article 3 of the Renewable Energy Development Act.
14. “Power Grid” means the whole or a part of a system, consisting of a set of conduits, supporting
equipment and transformer facilities, that distributes electricity by connecting the breakpoint
between the primary power-generating infrastructure and the electricity transmission and
distribution corporations to the users.
15. “Power Line” means the whole or a part of a system, consisted of a set of conduits, support
equipment and transformer facilities that connect the primary power-generating infrastructure to the
breakpoint of electricity transmission and distribution corporations or users of the electricity
generated by the former.
16. “Network” means the power grids and power lines installed pursuant to the Act.
17. “User” means the end user of the electricity other than the electricity enterprises.
18. “Contract Electric Appliance Installer” means the corporation that provides installation services
for systems relating to the electricity facilities and user’s electricity devices.
19. “Power Facility Inspection and Maintenance Administration” means the corporation that
provides the inspection and maintenance services for user’s electricity devices.
20. “Demand Response” means the changes in the power consumption in response to conditions of
the power supply systems.
21. “Ancillary Service” means the measures taken to facilitate the transmission of electricity and to
ensure the safety and stability of the power supply systems.
22. “Electricity Carbon Emission Factor” means the amount of the carbon dioxide emission per unit
of electricity generated.
23. “Direct Supply” means that a renewable-energy-based electricity generating corporation installs
power lines connecting directly to the users and thereby supplying power.
24. “Wheeling” means that an electricity transmission and distribution corporation installs power
grids to transmit and distribute electricity.
Article 3
The competent authorities referred to in this Act are the Ministry of Economic Affairs at the central
level, and the Municipal Governments at the municipal level, and the County (City) Government at
the county (city) level.
The central competent authority has the following duties:
1. To analyze, to draft, and to implement electricity supplier policies;
2. To supervise and to manage the electricity construction safety and electricity facilities in the
country;
3. To draft the regulations governing electric power techniques;
4. To supervise and to manage the electricity facilities;
5. To announce the percentage allocation of compensation to facilitate the development of electric
power;
6. To draft, to approve, and to manage the pricing of electricity and other fees and charges as well as
the calculation formulae thereof;
7. To supervise and to manage other matters relating to the electric power techniques and safety
thereof.
Competent authorities at the level of Municipal Governments or County (City) governments have
the following duties:
1. To forward the building and expansion applications of the electricity enterprise and the electricity
enterprise licenses applications;
2. To assist in the inspection of the user’s electricity device;
3. To cope with the disputes arising out of the land use between the electricity enterprise and the
general public;
4. To supervise and to manage the electric power engineering industry, electrical technicians, and
the power-use location.
The central competent authority shall designate the electricity industry regulatory authority to deal
with the following matters:
1. To supervise and to manage the electricity enterprise and electric power market;
2. To permit and to approve the building and expansion applications of the electricity enterprise and
the electricity enterprise licenses applications;
3. To forecast and to plan the matters pertaining to the electric power supply and demand;
4. To supervise and to manage the electricity carbon emission factor of the Electricity Retailing
Utility Enterprise;
5. To supervise and to manage the users’ rights and interests of access and use of electricity;
6. To supervise and to manage the dispatch of electricity;
7. To mediate the disputes arising between the electricity enterprises or between the enterprises and
the users;
8. To mediate the disputes involving the Electricity Retailing Enterprises or installations of the
Renewable-Energy-Based Power Generation Equipment.
The electricity industry regulatory authority manages and supervises the incorporation, merger,
restructuring and revocation of a government-owned electricity enterprise as well as the
employment and discharge of important personnel of the corporation.
The central competent authority carries out the responsibilities prescribed in the two preceding
paragraphs before the said authority designates an electricity industry regulatory authority.
The central competent authority may invite the government agencies, scholars and experts and the
related civil organizations to form the Electricity Reliability Commission and the Electricity
Industry Mediation Commission to carry out the responsibilities described in Paragraph 4
Subparagraphs 6 to 8 of this Article.
Article 4
An Electricity Enterprise is required to be a company limited by shares according to the Company
Act. However, the organizational structure required by a Renewable-Energy-Based Electricity
Generating Enterprise is to be announced by the electricity industry regulatory authority.
An Electricity Enterprise incorporated in the form of a company limited by shares with a certain
scale requires independent directors. The number of independent directors shall be no less than two
as well as one-fifth of the directorships.
The certain scale, qualifications and conditions of an independent director, as prescribed in the
preceding paragraphs of this Article, as well as other requirements associated with the said matters
are subject to the future announcement by the electricity industry regulatory authority.
Article 5
The Electricity Transmission and Distribution Enterprise shall be a state-owned corporation and no
more than one. The scope of its business operation covers the entire country.
An Electricity Generating Enterprise that generates power with nuclear power plants or a
hydroelectricity generating corporation whose capacity exceeds 20,000 kilowatts is required to be a
public corporation unless the electricity industry regulatory authority approves otherwise.
The “public corporation” as prescribed in the preceding paragraph refers to a corporation fully
funded by the government or a joint venture between the government and the private sector with the
government’s share of investment exceeding more than 50% of the total capital. An enterprise
receiving investment from a corporation, which is reinvested by public corporation with more than
50% of the total share, is also considered a public corporation.
Article 6
The Electricity Transmission and Distribution Enterprise may not engage in the generation or
retailing of electricity. Cross holdings of shares of the Electricity Generation and Retailing
Enterprises is prohibited. The engaging restriction however does not apply when the electricity
industry regulatory authority approves otherwise. In such circumstance, the Electricity Transmission
and Distribution Enterprise may run the Electricity Retailing Utility Enterprise concurrently.
An Electricity Transmission and Distribution Enterprise may engage in business pursuits other than
those in the electricity industry on the condition that the said business pursuits neither affect the
operation as an Electricity Transmission and Distribution Enterprise nor compromise the
maintenance of fair competition, and with the approval by the electricity industry regulatory
authority.
An Electricity Transmission and Distribution Enterprise shall establish a separating accounting
system for the losses and profits of the respective businesses. Cross subsidization is prohibited.
The electricity industry regulatory authority shall establish the accounting separation system,
accounting method, procedures and principles, guidelines for supervision and management of
accounting practices and other related matters.
To achieve the goal of steady supply of electricity, Taipower Company will be divided into an
Electricity Generating Enterprise and an Electricity Transmission and Distribution Enterprise, and
transform into a parent holding company that sets up Electricity Generating Enterprise and
Electricity Transmission and Distribution Enterprise as subsidiaries.
The first paragraph of this Article is effective in six years after the amended articles of the Act were
promulgated on January 11, 2017. However, the electricity industry regulatory authority may submit
to the Executive Yuan a request for a postponement of the effect date based on its assessment of the
development and condition of the electricity market. The postponement may be requested no more
than two times. The first postponement shall be limited to two years and the second limited to one
year.
Chapter 2 Electric Power Dispatching
Article 7
The electric power dispatching shall be based on the principles of safety, fairness, openness,
economy, environmental-friendliness and adherence of the energy policies.
Article 8
The Electricity Transmission and Distribution Enterprise is responsible for managing the electric
power dispatching by giving priority to the grid connections that allow access to the renewable
energy on the condition that the power systems remain safe and stable.
To perform the tasks assigned in the preceding paragraph, the Electricity Transmission and
Distribution Enterprise shall draft the regulations governing the scope, item, procedure, norm,
cost-sharing, emergency response and information disclosure of the electric power dispatching
according to the electric power dispatching principals drawn up by the electricity industry
regulatory authority, and submit the foregoing to the electricity industry regulatory authority for
approval. The review processes also apply to amendment of these regulations.
Article 9
To ensure the supply safe and stable of the power system, the Electricity Transmission and
Distribution Enterprise shall provide necessary ancillary services according to the needs of the
electric power dispatching and the application of the Electricity Generation Enterprise and Self-Use
Power Generation Equipment.
The Electricity Transmission and Distribution Enterprise may charge fees for ancillary services as
described in the preceding paragraph.
The ancillary service fees, as described in the previous paragraph, may be set based on the
Electricity Carbon Emission Factor and submitted to the Electricity Tariff Examination Council for
review and approval.
Article 10
A Renewable-Energy-Based Electricity Generating Enterprise or Retailing Enterprise that requires
the power grids to distribute the power generated or purchased for sale may request the service of
the Electricity Transmission and Distribution Enterprise for electric power dispatching and pay the
electricity dispatching service fee based on the total amount of electricity dispatched.
An Electricity Transmission and Distribution Enterprise shall charge the Renewable-Energy-Based
Electricity Generating Enterprise or Retailing Enterprise that uses its electricity supply
infrastructure based on the amount and rates of the re-supplied electricity.
The two fees described in the preceding paragraphs may be assessed according to the Electricity
Carbon Emission Factor and submitted to the Electricity Tariff Examination Council for review and
approval.
A discount for the fees prescribed in the previous paragraph may be given based on the Electricity
Carbon Emission Factor. The central competent authority shall establish rules governing the
discount of such fees.
Article 11
To meet the needs of the electricity market development, the Electricity Transmission and
Distribution Enterprise shall set up an electricity trading platform based on openness and
transparency after the power and grid unbundling subject to the permission of the electricity
industry regulatory authority.
The electricity trading platform provides full disclosure of trading information to fulfill the goals of
regulating the electricity supply and demand, facilitating the fair competition and reasonable
operations of the electricity enterprises.
The electricity industry regulatory authority shall establish the rules governing the personnel,
organization, schedule, trade management, and other related matters of the electricity trading
platform prescribed in the first paragraph of this Article.
Article 12
The electricity industry regulatory authority, for the purpose of protecting the public interest or the
electricity enterprises and the users’ rights and interests, may at any time order the Electricity
Transmission and Distribution Enterprise to provide financial or business operation reports, or audit
its businesses, properties, accounting books, documentations and other related articles of properties.
Should any serious violation of the laws and regulations be identified, the authority may seize and
seal or order the relevant documentations.
The Electricity Transmission and Distribution Enterprise shall not evade, impede or refuse the
orders and auditing pursuant to the previous paragraph.
Chapter 3 Permits and Licenses
Article 13
The Electricity Generating Enterprise and Electricity Transmission and Distribution Enterprise, in
building and expanding the infrastructure, shall prepare and submit an application and supporting
documentary evidence to the government authority to which the enterprise belongs or the competent
authority at the level of the Municipal Government or County (City) government for a permit to
apply to build or expand the infrastructure.
If the application for permit, as described in the preceding paragraph, requires an environmental
impact assessment pursuant to the Environmental Impact Assessment Act, the applicant shall
provide environment impact assessment documents reviewed or approved by an environmental
protection competent authority.
The building or expansion permit described in the first paragraph of the Article expires in three
years, but an application for extension of the time of the permit with due reasons may be submitted
prior to the expiration of the current permit. The extension period shall not exceed two years.
Article 14
The electricity industry regulatory authority, in reviewing the application for a permit prescribed in
the first paragraph of the preceding article, shall consider the energy policy, Electricity Carbon
Emission Factor, national land development, regional balance development, environmental
protection, fair competition among electricity enterprises, supply and demand of the electric energy,
backup capacity as well as safety of the power systems, in addition to the integrity of the applicant’s
plan.
Article 15
During the time of the building or expansion permit, the Electricity Transmission and Distribution
Enterprise shall obtain work permits issued by the electricity industry regulatory authority and begin
the construction. The construction shall be completed within the time of the work permit.
The time of the work permit described in the previous paragraph is five years. The restriction does
not apply if the corporations have due reasons and the electricity industry regulatory authority
approves the extension thereof.
The Electricity Transmission and Distribution Enterprise shall prepare the documents and
information in support of its application for issuing or replacement of the appropriate electricity
license to the government authority to which the corporation belongs or the competent authority at
the level of the Municipal Government or County (City) government. The application shall be
submitted within 30 days upon completion of the work.
After the submission of the application described in the previous paragraph, the enterprise may
begin its business operation only after the personnel designated by the electricity industry regulatory
authority performs the necessary inspection and approves the work, and that an appropriate
electricity license is issued or replaced.
The Electricity Retailing Enterprise shall submit an application to the electricity industry regulatory
authority for an appropriate electricity license before beginning its business operation.
Article 16
Unless otherwise approved by the electricity industry regulatory authority, the Electricity
Generating Enterprise that has been granted a building permit, expansion permit or work permit
shall not change the source of energy, system capacity or address of the facility of the Major Power
Generation Equipment.
Article 14 of this Act applies mutatis mutandis to the review of the foregoing paragraph.
Article 17
The effective period of an Electricity Enterprise license is twenty years starting from the date of
issuance by the electricity industry regulatory authority. The Electricity Generating Enterprise may
file for an extension with electricity industry regulatory authority one year prior to the expiration of
the license. Every extension period shall be no longer than 10 years.
Article 14 of this Act applies mutatis mutandis to the review of the applications for extension of
Electricity Generating Enterprise and Transmission and Distribution Enterprise licenses described in
the previous paragraph.
Article 18
The Electricity Transmission and Distribution Enterprise shall not reject any request put forward by
the Electricity Generating Enterprise or Self-Use Power Generation Equipment for connection to its
power grid. The Renewable-Energy-Based Electricity Generating Enterprise shall be given priority
to connect to the grid. The Article however does not apply to Electricity Facilities or Self-Use
Power Generation Equipment that request connection but do not meet the requirements provided in
Paragraph 1 and Paragraph 3 of Article 25, Article 26, Article 29 to Article 31, Article 71 mutatis
mutandis applying the above provisions or Article 32.
Article 19
An Electricity Enterprise shall not presume to terminate or suspend for business. However, the
restriction does not apply to the Electricity Generating Enterprise and Renewable-Energy-Based
Electricity Retailing Enterprise that have otherwise received permission from the electricity industry
regulatory authority.
The Electricity Generating Equipment and Renewable-Energy-Based Electricity Retailing
Equipment shall apply to the electricity industry regulatory authority for permission to suspend the
business by submitting a business suspension plan. The period of suspension shall not exceed one
year.
An Electricity Enterprise shall apply to the electricity industry regulatory authority for permission to
terminate the business by submitting a business termination plan, and return the Electricity
Enterprise license to the same regulatory authority for cancellation within 15 days of the termination
of business. The electricity industry regulatory authority may proceed to cancel the license if the
Electricity Enterprise fails to submit the license within the prescribed time limit.
Article 20
In the case of the suspension, termination of an Electricity Enterprise, or an Electricity Enterprise
that fails to extend the Electricity Enterprise license pursuant to Article 17 before it expires, or an
Electricity Enterprise that is ordered to suspend business operation or has its license revoked, the
electricity industry regulatory authority may coordinate to have other Electricity Enterprise take
over the operation to ensure the continuous service. When the coordination fails, the regulatory
authority may use the Electricity Facilities to continue the services. Reasonable remunerations shall
be made for the use of the Electricity Facilities of the Electricity Generating Enterprise.
When the coordination described in the previous paragraph fails and the Electricity Facilities of the
Electricity Generating Enterprise cease to supply electricity, the Electricity Transmission and
Distribution Enterprise shall dispatch the sources of supply to ensure continuous services. The
Electricity Generating Enterprise shall pay the electricity dispatching service fees. The Electricity
Transmission and Distribution Enterprise may also charge the users at the original rate for
electricity.
Article 21
Electricity Enterprises that intend to undertake mergers and acquisitions, in accordance with the
Business Mergers and Acquisitions Act, shall apply to the electricity industry regulatory authority
for written approval by submitting a merger plan, jointly written by the parties to the merger, which
states the scope of business, assets, liabilities and the amount of capital of the company after the
merger.
For a merger of a certain scale, the electricity industry regulatory authority shall work in
conjunction with the Fair Trade Commission to review the merger of the Electricity Enterprises,
hold public hearings in compliance with the hearing procedure prescribed in the Administrative
Procedure Act, and perform administrative investigation and professional assessment within its
powers.
The definition of the “certain scale” is subject to the electricity industry regulatory authority’s
announcement.
Article 22
Article 13 and Article 15 apply mutatis mutandis to the change of the sources of energy, system
capacity and address of the Major Power Generation Equipment as specified on the Electricity
Generating Enterprise license. An Electricity Generating Enterprise shall observe the requirements
and carry out the procedure accordingly before the changes become effective.
For an Electricity Generating Enterprise that is ordered to stop the work due to violation of the laws
and regulations, the electricity industry regulatory authority may revoke the whole or a part of its
original license.
Unless the Act specified otherwise, an Electricity Enterprise whose information specified on the
Electricity Enterprise’s license has changed shall apply to the electricity industry regulatory
authority for replacement of an updated license within 30 days after the registration of the
change(s).
Article 23
For an Electricity Enterprise that takes abusive conducts by its market power to interfere with the
order of the trade and has received disciplinary actions from the competent authority, the electricity
industry regulatory authority may check its operation details and order it to propose a correction
plan within a given time limit.
The electricity industry regulatory authority may revoke an Electricity Enterprise’s license when
one of the following events occurs:
1. An Electricity Enterprise takes abusive conducts by its market power to interfere with the order of
the trade and has been found guilty of such wrongdoing by the courts.
2. An Electricity Enterprise has committed the wrongdoings described in the previous paragraph,
and has been ordered by the electricity industry regulatory authority to propose a correction plan
within a given period, but did not propose one upon expiration of such time limit or failed to correct
the wrongdoings by the assigned date.
3. A government agency that orders an Electricity Enterprise to terminate the business for violation
of the law informs the electricity industry regulatory authority of such disciplinary action.
Article 24
The electricity industry regulatory authority shall establish the application procedures, document
requirements and review criteria governing the application of the permit to build or expand the
infrastructure of an Electricity Enterprise, work permit, issuance of a license, replacement of a
license, information to be specified on the license, extension, change of the power generation
equipment, suspension of business, termination of business, and merger and acquisition of business.
Chapter 4 Construction
Article 25
The Electricity Generating and Transmission and Distribution Enterprises shall set up the Electricity
Facilities accordingly.
The Electricity Transmission and Distribution Enterprise shall set up a power grid geographical
information management system to record, amongst other things, the names of the power networks,
voltages, locations of distribution and usage, and update the information whenever appropriate. The
competent authority may order the Electricity Transmission and Distribution Enterprise to provide
the information relating to the Power Grids, to supplement more information or dispatch personnel
for inspection.
The central competent authority shall establish the rules governing the scope, items, layout, safety
issues of the Electricity Facilities described in the first paragraph of this Article and other related
matters.
Article 26
The Electricity Enterprise shall provide electricity according to the prescribed voltage and
frequency standards. The restriction does not apply when the central competent authority approves
otherwise for reasons of special circumstances.
The central competent authority shall establish the voltage and frequency standards described in the
previous paragraph.
Article 27
To ensure the stability and safety of the power supply, the Electricity Generating and Retailing
Enterprises in selling the electric energy to users shall prepare the appropriate level of electricity
reserve capacity based on its electricity sales, and duly report to the electricity industry regulatory
authority. However, the restriction does not apply to Renewable-Energy-Based Electricity
Generating Enterprise below a certain capacity. To meet the required capacity, an Electricity
Generating Enterprise may either use its resources to generate power or purchase from other
Electricity Generating Enterprise, Self-Use Power Generation Equipment or Demand Response
providers.
The “certain capacity” mentioned in the previous paragraph is stipulated according to the
announcement of the electricity industry regulatory authority.
The electricity industry regulatory authority shall establish the rules governing the contents of the
electricity reserve capacity, calculation formula, criteria and scope, application procedure and period,
review, auditing, management and other related matters.
Article 28
When an Electricity Retailing Utility Enterprise sells electric power to its users, the sold electric
power shall have an Electricity Carbon Emission Factor that meets the electricity carbon emission
factor criteria and be reported to the electricity industry regulatory authority.
The Electricity Carbon Emission Factor criteria described in the previous paragraph are stipulated
by the electricity industry regulatory authority according to the national energy and carbon
reduction policies, and announced on a regular basis.
For the Electricity Carbon Emission Factor described in the first paragraph of this Article, the
electricity industry regulatory authority shall set out the rules governing the method of calculation,
reporting procedure and period, review, auditing, management and other related matters thereof.
Article 29
An Electricity Enterprise is required to install all necessary electric meters or similar instruments for
recording of the electric quantity, voltage, frequency, power factor, loading and other related
information.
Article 30
The Electricity Generating and Transmission and Distribution Enterprises shall duly install safety
devices to protect the Electricity Facilities.
The central competent authority prescirbes the location, method, maintenance and safety issues of
these safety protection installations described in the previous paragraph and other related matters.
Article 31
The Electricity Generating and Transmission and Distribution Enterprises shall perform regular
inspection and maintenance of the Electricity Facilities and duly record the inspection and
maintenance findings.
The central competent authority shall establish rules governing the items of inspection and
maintenance as prescribed in the previous paragraph, the interval thereof and other related matters.
Article 32
The Electricity Transmission and Distribution Enterprise or Renewable-Energy-Based Electricity
Generating Enterprise that installs private Networks to make Direct Supply to the users shall
perform inspection of the User’s Electricity Device; the service can only be connected when the
device passes the inspection. The Electricity Transmission and Distribution Enterprise or
Renewable-Energy-Based Electricity Generating Enterprise shall perform regular inspection of the
utilization equipment installed by the Users and record the results. In the event that non-conformity
is found, a time period shall be specified for the user to make rectification. The Electricity
Transmission and Distribution Enterprise or Renewable-Energy-Based Electricity Generating
Enterprise may stop servicing a user that refuses to undergo inspection or fails to address the
deficiencies within the given time.
The competent authority at the level of the municipal government or county (city) government shall
provide necessary assistance, when appropriate, to facilitate such inspection described in the
previous paragraph.
The competent authority at the level of the municipal government or county (city) government may
order the Electricity Transmission and Distribution Enterprise or Renewable-Energy-Based
Electricity Generating Enterprise to provide the information concerning the inspection described in
the first paragraph of this Article and the results thereof, and send personnel to audit the information
when appropriate. The Electricity Transmission and Distribution Enterprise or
Renewable-Energy-Based Electricity Generating Enterprise shall not evade, impede or refuse such
auditing.
The Electricity Transmission and Distribution Enterprise or Renewable-Energy-Based Electricity
Generating Enterprise may employ a duly licensed and registered technician or a Power Facility
Inspection and Maintenance Administration duly registered pursuant to Article 59 of this Act to
perform the inspection described in first paragraph of this Article.
The central competent authority shall establish rules governing the scope, items, elements,
installation and other safety issues of the User’s Electricity Device described in first paragraph of
this Article as well as the scope, criteria, interval and procedure of the inspection prescribed in the
previous paragraph.
Article 33
When the user’s usage, total floor area of the building or the story of the structure meet certain
criteria, the appropriate power distribution site and channel(s) shall be furnished at the building site
or inside the building structure and made available to the Electricity Transmission and Distribution
Enterprise free of charge for installation of the distribution systems. The Electricity Transmission
and Distribution Enterprise may refuse to provide services to the user when such furnishing is not
available.
The central competent authority and the central competent building authority shall jointly prescribe
the “certain criteria” mentioned in the previous paragraph and establish the rules governing the
method of establishment of the power distribution site and channel(s), elements, construction
procedure, safety measures and other related matters.
Article 34
When a fire breaks out or disaster hits the area in the proximity of the Electricity Facilities owned
by the Electricity Generating and Transmission and Distribution Enterprises, the Electricity
Generating and Transmission and Distribution Enterprises shall immediately dispatch technicians to
set up high-visibility signs or marks for protection and may cut down all of part of the electricity
supply or remove the hazardous electricity facilities.
Article 35
In case of a disaster, emergency or an event described in the previous paragraph, the affected
Electricity Generating and Transmission and Distribution Enterprises shall report such incident to
the competent authorities at different levels of the government by complying with the requirements
for the items to be reported, time limit, method and procedure specified by the central competent
authority.
Article 36
Electricity Enterprises may install private telecommunication facilities pursuant to the applicable
regulations provided in the Telecommunications Act to safeguard the needs of operation,
management or safety protection.
For effective management of resources, an Electricity Transmission and Distribution Enterprise may
apply for the license as a telecommunication service provider pursuant to Paragraph 2 of Article 6 of
this Act as well as the Telecommunications Act.
Article 37
When the circumstances require that the networks installed by the Electricity Generating and
Transmission and Distribution Enterprises be set up in proximity to or jointly with
telecommunication networks, the networks may be set up in parallel to or crisscrossing with each
other, or form a joint structure. Whichever the setup, the networks must meet the safety
requirements concerning the space interval and construction regulations.
The central competent authority shall work in conjunction with the National Communications
Committee to establish rules governing the paralleling, crossing or joint structures of the Electricity
Generating and Transmission and Distribution Enterprises’ networks and telecommunication
networks, the space interval, construction safety and other related matters.
Article 38
An Electricity Generating or Transmission and Distribution Enterprise may use or access the public
land and rivers, ditches, bridges, dykes, roads, green space, parks, forests and other public lands for
installation, construction or maintenance of the networks. To use the land for these purposes, the
Electricity Generating or Transmission and Distribution Enterprise shall send a prior notice to the
competent authority and comply with the applicable procedures and requirements.
Article 39
An Electricity Generating or Transmission and Distribution Enterprise may install networks above
and below the public and private lands or buildings as long as the installation of which does not
affect the original use and safety of the property being used. Unless an emergency occurs, a written
notice has been made to the owner or occupant thereof by the Electricity Generating or
Transmission and Distribution Enterprise seven days before the date of construction. In the event
that the owner or occupant raises an objection, the Electricity Generating or Transmission and
Distribution Enterprise may apply for a permit with the competent authority at the level of the
municipal government or county (city) government and proceed with construction, but shall still
send out a written notice to the owner or occupant seven days prior to the commencement of
construction.
Per the previous paragraph, an Electricity Transmission and Distribution
Enterprise may apply for a permit to proceed with construction. If the competent authority at the
level of the municipal government or county (city) government does not finish processing the
application within the established processing time period as prescribed in Article 51 of the
Administrative Procedure Act, the Electricity Enterprise may apply directly to the central competent
authority for a permit to proceed with construction.
The regulations governing the public services or facilities as provided in the Urban Planning Law
and the Regional Plan Act apply mutatis mutandis to the use or acquisition of the land by Electricity
Generating Enterprises for installation of powerlines.
The regulations governing the public services or facilities as provided in Article 8 of the Forestry
Act apply mutatis mutandis to an Electricity Generating Enterprise that rents the state-owned or
public forest land for installation of powerlines.
The regulations governing the general facilities in a fishing harbor as provided in Article 14 of the
Fishing Port Act apply mutatis mutandis to an Electricity Generating Enterprise whose installation
of powerlines is located in the area of a fishing harbor.
Article 40
To protect the networks and maintain the safety of the power supply, the Electricity Generating and
Transmission and Distribution Enterprises shall notify the owner or occupant of the trees obstructs
the networks to fell or trim the trees with a given period of time unless the law states otherwise. The
Electricity Enterprise may take actions to address the obstruction upon expiration of the given
period after the notice or failure to deliver the notice.
Article 41
In implementing the measures prescribed in the three preceding articles, a proposal that involves a
site or method that results in no loss or minimizes the loss shall be chosen and implemented. If the
action does lead to losses, compensation shall be made based on the extent of the loss.
Article 42
The owner or occupier of the land where the power supply networks are located may request to
move the networks when the designated use of the land is changed. The request shall be made in
writing with reasons and submitted to the Electricity Generating Enterprise or Electricity
Transmission and Distribution Enterprise that installs the network in question. Once the Electricity
Generating Enterprise or Electricity Transmission and Distribution Enterprise verifies the facts
presented in the request, the network may then be moved. The central competent authority shall
establish rules governing the payment for the material and cost associated with the movement.
Article 43
The Electricity Generating Enterprise or Electricity Transmission and Distribution Enterprise may,
for the purpose of managing special risks or preventing unusual hazards, take actions to address the
issues as described in Articles 38 to 40 of this Act. The company shall report such actions to the
competent authority of the competent authority at the level of the municipal government or county
(city) government where the company is located within 3 days and notify the owner or occupier of
the land.
Article 44
Disputes arising out of the issues described in Article 39 to Article 43 of this Act between an
Electricity Generating Enterprise or Electricity Transmission and Distribution Enterprise and an
owner or occupier of the land may be submitted to the jurisdiction of the competent authority at the
level of the municipal government or county (city) government where the company is located for
resolution.
The central competent authority shall establish rules governing the method, period and mediation
criteria for the resolution of disputes arising out of the use of the land by an Electricity Generating
Enterprise or Electricity Transmission and Distribution Enterprise.
Chapter 5 Business Operation
Article 45
The electricity generated by an Electricity Generating Enterprise may only be sold to an Electricity
Retailing Utility Enterprise or to an Electricity Transmission and Distribution Enterprise as the
auxiliary service. The restriction does not apply to Renewable-Energy-Based Electricity Generating
Enterprise.
Renewable-Energy-Based Electricity Generating Enterprise with powerlines connecting to the
power grids may turn to supply the electric power to users via the power grids.
Renewable-Energy-Based Electricity Generating Enterprise that have obtained approval from the
electricity industry regulatory authority may install powerlines connecting directly to the users, to
whom they supply electric energy.
For the Renewable-Energy-Based Electricity Generating Enterprise that wishes to apply for permit
direct supply of electric power, the electricity industry regulatory authority shall establish rules
governing the qualification, prerequisites, required documents, review criteria and other related
matters.
The provisions in the three preceding paragraphs become effective within a year after the
publication of the amended provisions on January 11, 2017. The Executive Yuan shall decide the
effective date. However, the electricity industry regulatory authority may review the status of the
electric power dispatching and submits a request for postponement of the effective date to the
Executive Yuan. The postponement may be requested no more than two times. The first
postponement shall be a period of one year and the second one a period of six months.
Article 46
The Electricity Transmission and Distribution Enterprise shall plan, build and maintain the power
grids across the country.
The Electricity Transmission and Distribution Enterprise shall not reject a user’s request for
installation of networks connecting the power grids to the user’s location. The restriction does not
apply when the electricity industry regulatory authority approves otherwise due to reasonable
justifications.
The Electricity Transmission and Distribution Enterprise shall make the power grids available for
use by Electricity Generating Enterprise or Electricity Retailing Enterprise based on the principles
of fairness and openness, allowing the producers and retailers to wheeling the electric power and
charge fees accordingly. Differential or favorable treatments to certain suppliers are prohibited.
However, the prohibition does not apply when the electricity industry regulatory authority approves
otherwise due to reasonable justifications.
The Electricity Transmission and Distribution Enterprise may charge the users for installation of
networks. The charge does not apply to residential users in remote areas.
Article 47
Electricity Retailing Utility Enterprise may purchase electric power from Electricity Generating
Enterprise or Self-Use Power Generation Equipment for wheeling to the users. Installation of major
power generation equipment is prohibited.
Renewable-Energy-Based Electricity Retailing Enterprise may purchase electricity generated by
renewable-energy-based power generation equipment for wheeling to the users. Installation of major
power generation equipment is prohibited.
Electricity Retailing Utility Enterprise shall not reject a user’s request for service unless the
electricity industry regulatory authority approves for reasonable justifications.
To ensure the effective implementation of the energy saving and carbon emission reduction policy,
Electricity Retailing Enterprise shall draft up an annual incentive program that encourages and
assists the users to save energy and submit such program to the electricity industry regulatory
authority for future reference.
The electricity industry regulatory authority shall publish the annual energy saving and carbon
emission reduction achievements as a result of the incentive programs instituted by the Electricity
Retailing Enterprise to meet the national energy saving and carbon emission reduction goals.
Article 48
Electricity Retailing Utility Enterprise may institute a pricing system that charges the base
consumption at kilowatt-hour (kWh) per month or based on the capacity required by the user.
For Electricity Retailing Utility Enterprise that charge a monthly base consumption, as described in
the previous paragraph, the users are charged for their actual usage when the actual monthly usage
exceeds the said monthly base consumption.
Article 49
The central competent authority shall establish the formulae that calculate the various rates of
charges to be assessed by the Electricity Retailing Utility Enterprise and Electricity Transmission
and Distribution Enterprise.
The Electricity Retailing Utility Enterprise and the Electricity Transmission and Distribution
Enterprise shall determine the price of electricity and various charges, report the rates to the central
competent authority for approval, and announce afterwards. The same process applies when the
rates are amended.
The central competent authority shall hold public hearings before deciding on the formulae that
calculate the price of electricity and various rates and charges as provided in the first paragraph of
this Article. The same process applies when the rates are amended.
The central competent authority may invite other government agencies, scholars and experts and
civil organizations of related interests to participate in the Electricity Tariff Examination Council to
review and determine the price of electricity, rates and charges and other related matters.
Article 50
The Electricity Retailing Utility Enterprise shall institute a regulation governing the business
operation, submit the regulation to the electricity industry regulatory authority for approval, and
promulgate the same as it becomes effective. The same process applies when the regulation is
amended.
The Renewable-Energy-Based Electricity Generating Enterprise and Renewable-Energy-Based
Electricity Retailing Enterprise, both of which sell electric power to users, shall institute a
regulation governing the business operation and submit the same to the electricity industry
regulatory authority for reference within 30 days after the institution of such regulation. The same
process applies when the regulation is amended.
Article 51
The users that receive service via an Electricity Transmission and Distribution Enterprise’s network
shall make available a site free of charge for installation of an electricity meter.
The Electricity Transmission and Distribution Enterprise has the duty to install and maintain the
electricity meter prescribed in the previous paragraph.
Article 52
The Electricity Retailing Utility Enterprise shall supply electricity to the public utilities including
the water plants, electric trains and electric railways, the public and private schools at all levels,
sheltered workshops, registered social welfare organizations and nursing homes at a discount rate
that is below the average price of electricity but no lower than the electricity supply cost.
The Electricity Retailing Utility Enterprise shall supply electricity that services the life support
systems and essential life aids in the households with people with physical or mental disabilities at
the discount rate that reflects the first block of the Inclining Block Rate or the electricity supply cost,
whichever is lower.
The Electricity Retailing Utility Enterprise shall supply electricity that services the street lights on
public roads at the discount rate that is below the average price of electricity but no lower than half
of the average rate of lighting device.
The sheltered workshops, registered social welfare organizations and nursing homes as mentioned
in the first paragraph of this article are subject to the recognition and approval by the central
competent authority that oversees special purpose corporations.
The central competent authority shall define the pricing of the services described in the first
paragraph of this article.
The central competent authority shall work in conjunction with the competent central authority that
oversees the special purpose corporations to establish the rules governing the eligibility criteria for
recognition as a household with members with physical or mental disabilities, the scope of
application for life support systems and essential life aids, and the calculation of the price of
electricity.
Article 53
When the Electricity Retailing Utility Enterprise supply electricity at a discount rate pursuant to
paragraphs 1 to 3 of the preceding article, the competent authorities that oversee the respective
categories of corporations and organizations may budget to subsidize the shortfall.
Article 54
The Electricity Retailing Utility Enterprise shall ensure availability of the service around the clock.
However, restrictions on the availability of the service at certain hours may be allowed when the
electricity industry regulatory authority approves otherwise due to special circumstances.
Article 55
In the event of a complete or partial power suspension due to an accident not attributable to the
utility electricity retailing corporation shall be reported to the competent authority at the level of the
municipal government or county (city) government for approval and announce so in advance unless
the interruption occurs due to an unexpected failure, in which case the report may be filed later. The
competent authority at the level of the municipal government or county (city) government shall
report the power suspension to the electricity industry regulatory authority for approval when the
power suspension lasts for more than 15 days.
Article 56
For any unauthorized consumption of electricity, the Renewable-Energy-Based Electricity
Generating Enterprise and Electricity Retailing Enterprise may calculate the loss based on the
unauthorized user’s utilization equipment, type of consumption, and watts or horsepower consumed
in relation to the hours of service availability and the price of electricity assigned by the supplier,
and claim against the unauthorized user accordingly. The maximum compensation shall not exceed
one year of service charges.
The electricity industry regulatory authority shall establish rules governing the identification,
recognition, compensation criteria and the resolution of the unauthorized consumption of electricity
described in the previous paragraph.
Article 57
When the government requests emergency power supply for prevention of disasters, the Electricity
Generating Enterprise and Self-Use Power Generation Equipment shall give priority to supply
power. The Electricity Transmission and Distribution Enterprise shall first arrange services from
these sources. The requesting government agency is responsible for paying the charges of electricity
usage.
Chapter 6 Supervision and Management
Article 58
The Electricity Generating Enterprise and Electricity Transmission and Distribution Enterprise shall
set up a directorial engineer position; the qualification of which is to be determined by the central
competent authority.
Article 59
The Contract Electric Appliance Installer and the Power Facility Inspection and Maintenance
Administration shall register with the competent authority at the level of the municipal government
or county (city) government and join the trade association appropriate for the industry within one
month of registration before beginning the business operation. A trade association appropriate for
the industry shall not reject the enrollment of the said installer and administrations.
The installation, construction and retrofitting of the user utilization equipment shall be undertaken
by a Contract Electric Appliance Installer. The energization of the equipment may begin only after
the installer notifies the electricity corporations of the completion of the work and activation of the
service by submitting a certificate of completion of work by a member issued by an electrical
contractor association. The restriction does not apply when other regulations stipulate otherwise.
The review and approval or energization of the electricity facilities or user’s electricity devices may
not begin without first submitting a membership certificate issued by the respective electric engineer
association along with the drawing design and description or the report of completion of the tasks of
electricity facilities and user’s electricity devices to be designed or supervised by lawfully registered
and practicing professional electrical engineers, that are submitted for electricity corporations
review and approval.
Said electrical engineers shall not practice the design or installation supervision business for
electricity facilities or user’s electricity devices before enrolling in the local electrical engineer
association, which shall not reject the enrollment of the said engineers.
The personnel employed by the Contract Electric Appliance Installer and the Power Facility
Inspection and Maintenance Administration to work in the field of electrical engineering shall
possess one of the following qualifications:
1. The person has satisfactorily passed the examinations for professional engineers in the field of
electrical engineering and thereby possessed a certificate of professional engineer.
2. The person has satisfactorily passed the proficiency tests in the field of electrical engineering and
thereby possessed a certificate of technician.
3. The person has become a certified electrician by duly passing the appropriate examinations
accordingly to the applicable laws and regulations before March 5, 2007, when the amended
provisions became effective.
For the current technical personnel in the field of electrical engineering registered with the
competent authority at the level of the municipal government or county (city) government, or the
technical personnel who had registered with the said authority for a period of more than six months
prior to the amendment of this Act which became effective on January 11, 2017, the personnel
whose qualifications do not meet the criteria provided in the previous paragraph after the
amendment of this Act still retain the qualification as an electrical technical personnel of the
originally registered class.
The central competent authority shall establish rules governing the qualifications, prerequisites,
registration, revocation or cancellation of the registration, and management of the Contract Electric
Appliance Installer and the Power Facility Inspection and Maintenance Administration.
Article 60
Industrial plant, mine field and structures and buildings for public use that are installed with power
equipment, and power-use locations that are fed by electricity classified as high voltage or above
shall employ a full-time electrical technician or entrust to an electricity facilities inspection and
maintenance service provider to ensure the safety of general and emergency power equipment use
within the boundary lines of the electricity supply equipment of the electricity corporations, and
register with the local competent authority.
The central competent authority shall establish rules governing the scope of electrical equipment
and energized facilities, registration, revocation or cancellation of registration, maintenance, time
limits for reporting, method of documentation and management, as well as the recognition of the
full-time electrical technical personnel, qualifications, management and other related matters.
Article 61
The tasks of design and installation supervision of electricity facilities and user energization
equipment that fall within the scope defined by the central competent authority shall be
administered by legally registered and practicing professional electrical engineers or related
professional engineers. The tasks outside the said scope shall be administered by professional
electrical engineers or electric appliance installers. However, the said tasks for the exclusive use by
government agency or state-owned enterprises may be administered by the employees of the
respective government agency or state-owned enterprises who have legally obtained certification as
professional electrical engineers or relevant professional engineers.
The scope of the user’s electricity devices in the preceding paragraph shall be consistent with the
pre-existing scope of electricity corporations in force prior to the promulgation of amendment of
this Act made on January 19, 2005. As amending the said scope, the central competent authority
shall consult professional electrical engineer association, electrical contractors association and other
trade associations.
In the event that an electricity corporation or a user fails to comply with Paragraph 1 of this Article,
the central competent authority may forbid the supplier to use the electricity facilities in question, or
the electrical corporations shall not energize the user’s electricity devices in question.
Article 62
The Contract Electric Appliance Installer and the Power Facility Inspection and Maintenance
Administration are prohibited from engaging in the following acts:
1. To use the license registered to others;
2. To allow others to use its registered license;
3. To participate in the tendering process or accept contracts during the period of closure for
business;
4. To reduce or downgrade the construction material to save on cost;
5. To subcontract or hire out the contracts to unlicensed service providers;
6. The percentage of subcontracts exceeds 40% of the total contract price;
7. To issue reports that contain false information about installation, inspection, and maintenance
services performed on a contract.
To manage the Contract Electric Appliance Installer and the Power Facility Inspection and
Maintenance Administration, to protect the public interest and safety, or in response to the needs
arising in the process of auditing the measures and qualifications for registration as prescribed in the
previous paragraph, the competent authority may demand the Contract Electric Appliance Installer
or the Power Facility Inspection and Maintenance Administration to supply relevant information,
and send personnel to perform auditing when necessary. The Contract Electric Appliance Installer or
the Power Facility Inspection and Maintenance Administration shall not evade, impede or refuse
such requests.
Article 63
The full-time electrical technical personnel in the energized facilities are prohibited from making
false claims or misrepresentation of information in the statements and reports made in the course of
carrying out his/her duty.
Article 64
An Electricity Generating Enterprise shall comply with the following rule in determining the
allocation of the annual profits. Allocation of the annual net profit (not including those from the
generation of renewable-energy-based electricity) whose portion over the total paid-in capital shall
be prioritized to the measures of improving the operation and maintenance of the machineries,
investing in the pollution-minimizing infrastructure and facilitating further advancement in the
renewable energy. The allocation requirements are set out below:
1. When the annual net profit is more than 10% but less than 25% of the total paid-in capital, 50%
of the amount in excess of the total paid-in capital shall be allocated.
2. When the annual net profit exceeds the total paid-in capital by 25% or more, the full amount in
excess of the total paid-in capital shall be allocated.
50% of the allocated amount prescribed above shall be used in measures of improving the operation
and maintenance of the machineries as well as investment in the pollution-minimizing infrastructure
as the remaining 50% shall be invested in the development of renewable energy.
When the annual net profit is less than 10% of the paid-in capital, the central competent authority
shall order the Electricity Generating Enterprise to engage in hardware improvements based on the
findings of the inspection and maintenance performed according to Article 31.
Paragraph 1 of this article does not apply to the electricity producers whose Electricity Carbon
Emission Factor for generation of electric energy is better than the standard prescribed by the
electricity industry regulatory authority in accordance with Paragraph 2 of Article 28 hereunder.
The electricity industry regulatory authority shall establish the rules governing affirmation, use,
management and supervision of the funds used to improve the operation and maintenance of the
machineries, to invest in the pollution-minimizing infrastructure, and to facilitate the development
of the renewable energy.
Article 65
To facilitate the development and operation of the electric power, to develop the areas in the
proximity of the Electricity Generation, Transformation and Distribution Facilities, and to bring
welfare to the residents thereof, the Electricity Generating Enterprise and Electricity Transmission
and distribution Enterprise shall allocate assistance fund to facilitate the development of electric
power to assist the competent authority at the level of the municipal government or county (city)
government in promoting development of electricity and harmony with the communities. The given
assistance fund is on the basis of a certain percentage of the kilowatts of electricity generated or
transmitted.
The central competent authority shall establish the rules governing the method, scope and
supervision of the use of the electricity development assistance fund prescribed in the previous
paragraph. The competent authority at the level of the municipal government or county (city)
government may send personnel to audit the use when necessary. The electricity producers and
distributors shall not evade, impede or refuse such auditing.
This article does not apply to Renewable-Energy-Based Electricity Generating Enterprise except for
producers of electricity by wind power and with solar power-generating infrastructure of certain
capacity.
The percentage allocation of compensation to facilitate the development of electric power as
prescribed in Paragraph 1 of this Article and the “certain capacity” mentioned in Paragraph 3 of this
Article are to be defined and announced by the central competent authority.
The competent authority at the level of the municipal government or county (city) government shall
disclose the use of the electricity development funds in quarterly reports online.
Article 66
To ensure open access of information, Electricity Enterprise shall draft monthly summary reports on
the operation, supply and demand of the electric energy and the company’s financial status on a
monthly basis as well as an annual report within three months as one business year ends, and
distribute the reports to the electricity industry regulatory authority and the central competent
authority for future reference. Open access to the information shall be provided.
The electricity industry regulatory authority or central competent authority may order the supplier to
supply supplementary information about the monthly summary reports and annual reports or send
personnel for a site inspection.
The information available to the general public as well as the content and format of the monthly
summary reports and annual reports are to be defined and announced by the electricity industry
regulatory authority.
Article 67
The equipment of Electricity Enterprises and the safety protection devices prescribed in Paragraph 1
of Article 30 herein are subject to the inspection performed by the competent authority at any time.
In case of failure to conform to the requirements, repair, modification or replacement within the
time limit is required. Should the potential of imminent danger occur, the works and the use of
devices may be suspended by order.
The Electricity Generating Enterprise and Electricity Transmission and Distribution Enterprise shall
not evade, impede or refuse such auditing prescribed in the previous paragraph.
Chapter 7 Self-Use Power Generation Equipment
Article 68
The owner that installs a Self-Use Power Generation Equipment with a capacity of 2,000 kilowatts
or more is required to prepare an utilization plan and to apply to the electricity industry regulatory
authority for permission. The owner that installs a Self-Use Power Generation Equipment with a
capacity of less than 2000 kilowatts is required to prepare an utilization plan and to apply to the
competent authority at the level of the municipal government or county (city) government for
permission; the application will be forwarded to the electricity industry regulatory authority for
future reference.
The electricity industry regulatory authority shall establish the rules governing the application
procedure, periods of time, items for review and management rules regarding permission,
registration, revocation or cancellation of the registration and changes of the electricity industry
regulatory authority described in the previous paragraph.
Article 69
The Self-Use Power Generation Equipment may sell the self-generated electricity to the Electricity
Retailing Enterprise or the Electricity Transmission and Distribution Enterprise as the Ancillary
Service. The sale shall be no more than 20% of the capacity of the facilities. Nevertheless, the
restriction does not apply when one of the following occurs:
1. The Self-Use Power Generation Equipment whose energy efficiency performance meets the
standard prescribed by the electricity industry regulatory authority may sell electricity up to 50% of
the total capacity of its infrastructure.
2. If the electricity is generated from renewable energy sources, all electric power produced by the
Self-Use Power Generation Equipment may be sold to the Electricity Enterprise.
For Self-Use Power Generation Equipment with the capacity of 2,000 kilowatts or more, the
purchase and sale contract described in the previous paragraph shall be submitted to the electricity
industry regulatory authority for filing. For Self-Use Power Generation Equipment with the capacity
of less than 2000 kilowatts, the purchase and sale contract shall be submitted to the competent
authority at the level of the municipal government or county (city) government for future reference
with a copy forwarded to the electricity industry regulatory authority.
Article 70
The installation of user utilization equipment by a Self-Use Power Generation Equipment is limited
to its self-owned land area. However, the restriction does not apply when the government agency
prescribed in Paragraph 1 of Article 68 hereof approves otherwise and the installation does not
constitute a hindrance to the local electricity suppliers.
The Self-Use Power Generation Equipment may wheel the electricity via the power grids for
self-use when the following conditions are met:
1. The Electricity Carbon Emission Factor generated by the electric power is better than the standard
prescribed by the electricity industry regulatory authority in Paragraph 2 of Article 28 hereof.
2. When the Self-Use Power Generation Equipment is installed jointly by several applicants, the
percentage of investment per applicant shall be 5% or more.
3. The generated electric power may not be sold to Electricity Retailing or Electricity Transmission
and Distribution Enterprise.
Paragraph 1 of Article 10 and Paragraph 3 of Article 46 hereof apply mutatis mutandis to the
application by a Self-Use Power Generation Equipment for wheeling the electricity through the
power grids for self-use prescribed in the preceding paragraph.
Paragraph 3 to Paragraph 5 of Article 39 and Article 40 to Article 44 apply mutatis mutandis to the
installation of powerlines by a Self-Use Power Generation Equipment pursuant to Paragraph 2 of
this Article.
Article 71
Paragraph 3 of Article 25, Article 26, Article 29 to Article 31, Article 34, Article 35, Article 37, and
Article 58 of this Act apply mutatis mutandis to installation, energization, building, protection and
reporting of a Self-Use Power Generation Equipment, the joint structure of the facility with the
telecommunication network, and the placement of a directorial engineer.
Chapter 8 Penalties
Article 71-1
Any person who, through theft, sabotage or other methods, endangers the proper operation of major
power generation equipment, fuel storage and delivery equipment, control rooms, switching stations,
information and communication rooms, in any hydropower plant with an installed capacity of
1,000,000 kilowatts or higher or any thermal power plant with an installed capacity of 1,200,000
kilowatts or higher, or ultra high voltage and above transformation and distribution facilities or
system operator shall be sentenced to imprisonment between 1 and 7 years; in addition thereto, a
fine not more than NT$10,000,000 may be imposed.
Any person who commits an offense under the preceding paragraph with the intention to endanger
national security or social stability shall be sentenced to imprisonment between 3 and 10 years; in
addition thereto, a fine not more than NT$50,000,000 may be imposed.
Any person who commits the offenses specified in the preceding two paragraphs resulting in a
disaster shall have their sentence increased by up to one half; if the offense results in death, the
offender shall be sentenced to life imprisonment or imprisonment for more than 7 years, and in
addition thereto a fine not more than NT$100,000,000 may be imposed; if the offense results in
serious physical injury, the offender shall be sentenced to imprisonment between 5 and 12 years,
and in addition thereto a fine not more than NT$80,000,000 may be imposed.
Any person who attempts without success to commit an offense specified in paragraphs 1 and 2
shall also be subject to penalty.
Article 71-2
Any person, who endangers the proper operation of core information and communication systems in
the electricity facilities specified in paragraph 1 of the preceding article by any of the following
methods, shall be sentenced to imprisonment between 1 and 7 years; in addition thereto, a fine not
more than NT$10,000,000 may be imposed.
1. Gaining access to another person’s computer or related equipment without proper reason by
entering their account password, cracking the protective measures of the computer, or exploiting
loopholes in the computer system.
2. Interfering without proper reason with another person’s computer or related equipment through
the use of computer programs or other electromagnetic methods.
3. Obtaining, deleting or altering the electromagnetic records of another person’s computer or
related equipment without proper reason.
Any person who creates computer programs for themselves or others to commit offenses specified
in the preceding paragraphs shall be subject to the same penalty.
Any person who commits an offense under the three preceding paragraphs with the intention to
endanger national security or social stability shall be sentenced to imprisonment between 3 and 10
years; in addition thereto, a fine not more than NT$50,000,000 may be imposed.
A person who commits the offenses specified in the preceding three paragraphs resulting in a
disaster shall have their sentence increased by up to one half; if the offense results in death, the
offender shall be sentenced to life imprisonment or imprisonment for more than 7 years, and in
addition thereto a fine not more than NT$100,000,000 may be imposed; if the offense results in
serious physical injury, the offender shall be sentenced to imprisonment between 5 and 12 years,
and in addition thereto a fine not more than NT$80,000,000 may be imposed.
Any person who attempts without success to commit an offense specified in paragraphs 1 to 3 shall
also be subject to penalty.
Article 72
An Electricity Enterprise that operates without obtaining an appropriate license pursuant to Article
15 is subject to a fine ranging from NT$2,500,000 to NT$25,000,000 imposed by the electricity
industry regulatory authority, and a time limit is given to correct the violation. If the violation is of
very serious nature, the Electricity Enterprise may be ordered to wind up. The Electricity Enterprise
failing to take corrective actions or continues its business operation despite the order of suspension
shall be fined consecutively.
Article 73
An Electricity Transmission and Distribution Enterprise that fits in one of the situations described
below is subject to a fine ranging from NT$2,500,000 to NT$25,000,000 imposed by the electricity
industry regulatory authority and given a period to correct the violation. The Electricity
Transmission and Distribution Enterprise that fails to take corrective actions upon the expiration of
the given period shall be fined per violation:
1. Failing to manage the electric power dispatching pursuant to Article 8, Paragraph 1 of this Act;
2. Failing to draft a rule governing the electric power dispatching pursuant to Article 8, Paragraph 2
of this Act; or failing to manage the electric power dispatching according to the approved rule as the
failure is of serious nature.
Article 74
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$1,500,000 to $15,000,000 imposed by the electricity industry regulatory authority
and given a period to correct the violation. Failure to correct the violations upon the expiration of
the given period shall subject the Electricity Enterprise to a penalty consecutively:
1. Failing to provide necessary support services required in Article 9, Paragraph 1 without
reasonable justifications;
2. Rejecting a request for connecting the power grids in violation of Article 18;
3. Suspending or terminating the business without approval in violation of Article 19, Paragraph 1;
4. Proceeding with a business merger without approval in violation of Article 21;
5. Failing to make available certain capacity for backup supply required in Article 27, Paragraph 1;
6. Failing to meet the announced Electricity Carbon Emission Factor standard required in Article 28,
Paragraph 1;
7. Installing powerlines that enable direct power supply to the users without approval in violation of
Article 45, Paragraph 3;
8. Failing to plan, build or maintain the power networks across the country in violation of Article 46,
Paragraph 1;
9. Refusing to install the network connecting the power grids to the users in violation of Article 46
Paragraph 2;
10. Giving unfairly differential treatments to certain users or refuse, without the required approval,
to make the power grids available to Electricity Enterprise for utilization in violation of Article 46,
Paragraph 3;
11. Installing the primary power-generating infrastructure in violation of Article 47, Paragraphs 1
and 2;
12. Rejecting an user’s request for services in violation of Article 47, Paragraph 3 of this Act;
13. Failing to provide the service within the hours prescribed in Article 54;
14. Rejecting the request for emergency services by a government agency in violation of Article 57;
15. Failing to allocate the required funds to improve the operation and maintenance of the
machineries, to invest in the pollution-minimizing infrastructure and to facilitate the advancement of
the renewable energy in violation of Article 64 Paragraph 1 of this Act.
An Electricity Enterprise that fits into one of the situations described in subparagraph 2 and
subparagraphs 7 to 15 of the preceding paragraph is subject to penalty by the electricity industry
regulatory authority. A supplier that has been disciplined twice according to the previous paragraph
may be ordered to suspend its business operation for three to six months, to replace the
person-in-charge of the supplier or to revoke the electricity supplier license.
Article 75
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$1,000,000 to NT$10,000,000 imposed by the electricity industry regulatory
authority and given a period to correct the violation. The Electricity Enterprise that fails to correct
the violations upon the expiration of the given period shall be fined consecutively:
1. Failing to set up the office of an independent director required in Article 4, Paragraph 2;
2. Engaging in the business operation of other aspects of the Electricity Enterprise in violation of
Article 6, Paragraph 1; engaging in the business operation of other industries without approval in
violation of Article 6, Paragraph 2; failing to implement an accounting system appropriate for
keeping accounts of the losses and profits of the respective operations, or engaging in cross
subsidization in violation of Article 6, Paragraph 3; violating the regulations governing the
accounting separation system, accounting methods, procedures and principles as well as the
supervision and management of the accounting practices, as provided in Article 6, Paragraph 4, and
the circumstances are considered serious;
3. Commencing the construction work without permission in violation of Article 15, Paragraph 1;
4. Changing the energy sources, capacity or the site address of the primary infrastructure without
approval and commence construction work in violation of Article 16, Paragraph 1;
5. Failing to comply with the procedure for reporting the capacity allocated to backup supply, the
period and the management thereof as prescribed in Article 27, Paragraph 3, and the circumstances
are considered serious.
Article 76
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$1,000,000 to NT$10,000,000 imposed by the central competent authority and
given a period to correct the violation. The Electricity Enterprise that fails to correct the violations
upon the expiration of the given period shall be fined consecutively:
1. Failing to install the electricity supply infrastructure according to the established rules governing
the scope, items, layout, and safety issues prescribed in Article 25, Paragraph 3;
2. Failing to supply electricity of the required voltage and frequency prescribed in Article 26,
Paragraph 1;
3. Failing to install all meters and instruments necessary as prescribed in Article 29;
4. Failing to install safety protection devices as prescribed in Article 30 Paragraph 1;
5. Failing to perform regular inspection and maintenance of the electricity supplier infrastructure
and duly record the findings as prescribed in Article 31, Paragraph 1;
6. Failing to comply with the rules governing the installation of networks, space interval, and
construction safety as prescribed in Article 37, Paragraph 2;
7. Failing to charge at the rates according to the price of electricity and various other charges
approved under the Article 49, Paragraph 2;
8. Failing to set up a directorial engineer position as prescribed in Article 58;
9. Failing to establish the assistance fund to facilitate the development of electric power as
prescribed in Article 65 Paragraph 1;
A Electricity Enterprise that fails to announce the price of electricity and various rates and charges
pursuant to Article 49, Paragraph 2 is subject to a fine imposed by the central competent authority,
ranging from NT$500,000 to NT$5,000,000 and given a period to correct the violation. The
Electricity Enterprise that fails to correct the violations upon the expiration of the given period shall
be fined consecutively.
Article 77
An Electricity Enterprise that fails to submit the reports for future reference or to publicize certain
information as prescribed in Article 66, Paragraph 1, or violates Paragraph 2 of the same article by
refusing to supply supplementary information or accept auditing, is subject to a fine in an amount
ranging from NT$1,000,000 to NT$10,000,000 imposed by electricity industry regulatory authority
or the central competent authority and given a period to correct the violation. The Electricity
Enterprise that fails to correct the violations upon the expiration of the given period shall be
punished consecutively.
Article 78
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$1,000,000 to NT$10,000,000 imposed by the competent authority and given a
period to correct the violation. The Electricity Enterprise that fails to correct the violations upon the
expiration of the given period shall be fined consecutively:
1. Failing to set up a power grid geographical information management system as prescribed in
Article 25, Paragraph 2 and to update the information on the platform accordingly, or refuse to
provide supplementary information or to accept inspection as prescribed in the same article;
2. Failing to repair, alter or replace the Electricity Enterprise infrastructure or safety protection
devices that do not conform to the requirements within the given period in violation of Article 67,
Paragraph 1;
3. Evading, impeding or refusing the auditing or inspection in violation of Article 67, Paragraph 2;
Article 79
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$500,000 to NT$5,000,000 imposed by the electricity industry regulatory
authority:
1. Evading, impeding or refusing the electricity industry regulatory authority’s order or inspection in
violation of Article 12, Paragraph 2 of;
2. Failing to apply for renewal of the license prior to the expiration of the prescribed time limit in
violation of Article 17, Paragraph 1;
3. Failing to apply for replacement of an outdated license prior to the expiration of the time limit
prescribed in Article 22, Paragraph 3;
The Electricity Enterprise that fits into the situation described in either Subparagraph 1 or
Subparagraph 3 of the preceding paragraph will be given a period to correct the violation. The
supplier that fails to correct the violations upon the expiration of the given period shall be penalized
per violation.
Article 80
An Electricity Generating Enterprise or Electricity Transmission and Distribution Enterprise that
fails to file reports as prescribed in Article 35 is subject to a fine ranging from NT$500,000 to
NT$5,000,000 by the competent authority and given a period to correct the violation. The
Electricity Generating Enterprise or Electricity Transmission and Distribution Enterprise that fails to
correct the violations upon the expiration of the given period shall be punished per violation.
A Self-Use Power Generation Equipment that fails to file reports pursuant to Article 71 of the Act
which applies mutatis mutandis Article 35 is subject to a fine ranging from NT$200,000 to
NT$2,000,000 imposed imposed by the competent authority and given a period to correct the
violation. The Self-Use Power Generation Equipment that fails to correct the violations upon the
expiration of the given period shall be punished per violation.
Article 81
An Electricity Enterprise that fits into one of the situations described below is subject to a fine
ranging from NT$500,000 to NT$5,000,000 imposed by the competent authority at the level of the
municipal government or county (city) government and given a period to correct the violation. The
Electricity Enterprise that fails to correct the violations upon the expiration of the given period shall
be punished per violation:
1. Failing to perform required inspections, to provide services to users when their utilization
equipment fails to pass the inspections, to perform regular inspections, to keep a record of the
regular inspections, or to notify the non-conforming users to correct the deficiencies within a
definite period of time in violation of Article 32, Paragraph 1;
2. Evading, impeding or refusing to file reports, to provide relevant information or to accept
auditing in violation of Article 32, Paragraph 3;
3. Failing to immediately dispatch technical personnel to erect visible signs and to put in protection
measures as prescribed in Article 34;
4. Failing to comply with Article 43by reporting its actions or notifying the parties within the
prescribed time;
5. Failing to comply with Article 55 by obtaining the required approval or filing the report after the
event;
6. Failing to verify the membership certificate of completion of work before allowing energization
of the equipment in violation of Article 59, Paragraph 2;
7. Failing to verify the membership certificate issued by an appropriate electrical engineer
association before reviewing and approving the service request for energization of Electricity
Facilities or User’s Electricity Device in violation of Article 59, Paragraph 3;
8. Failing to use the electricity development assistance fund according to the method and scope
prescribed by the central competent authority, or to evade, to impede, and to refuse auditing
performed by the competent authority at the level of the municipal government or county (city)
government in violation of Article 65, Paragraph 2.
Article 82
The owner that installs a Self-Use Power Generation Equipment, which fits into one of the
situations described below, is subject to a fine ranging from NT$200,000 to NT$2,000,000 and
given a period to correct the violation. The facility that fails to correct the violations upon the
expiration of the given period shall be punished per violation:
1. Installing a Self-Use Power Generation Equipment without permission in violation of Article 68,
Paragraph 1; failing to comply with the rules governing the management of private
power-generating facilities, and the circumstances are serious;
2. Selling the electric energy in violation of Article 69, Paragraph 1;
3. Installing the user utilization equipment in violation of Article 70, Paragraph 1;
4. Failing to immediately dispatch technical personnel to erect visible signs and put in protection
measures as prescribed in Article 71 mutatis mutandis applying Article 34;
The owner that installs a Self-Use Power Generation Equipment, which fits into one of the
situations described in Subparagraphs 1 to 3 of the preceding paragraph and has a capacity of 2,000
kilowatts or more, is subject to disciplinary actions imposed by the Electricity Enterprise regulatory
agency; a Self-Use Power Generation Equipment with capacity of no more than 2000 kilowatts is
subject to disciplinary actions imposed by the competent authority at the level of the municipal
government or county (city) government.
The owner that installs a Self-Use Power Generation Equipment, which fits into the situation
described in Paragraph 1 Subparagraph 4 of this article, is subject to disciplinary actions imposed by
the competent authority at the level of the municipal government or county (city) government.
Article 83
A Contract Electric Appliance Installer or a Power Facility Inspection and Maintenance
Administration that carries out business operation without the required registration is subject to a
fine ranging from NT$200,000 to NT$2,000,000 imposed by the competent authority at the level of
the municipal government or county (city) government.
The Contract Electric Appliance Installer or the Power Facility Inspection and Maintenance
Administration that fits into the situation described in the preceding paragraph will be given a
period to correct the violation by the competent authority at the level of the municipal government
or county (city) government, or ordered to suspend business operation if the violation is of serious
nature. The Contract Electric Appliance Installer or the Power Facility Inspection and Maintenance
Administration that fails to correct the violations or suspend business operation upon the expiration
of the given period shall be fined per violation.
Article 84
A Contract Electric Appliance Installer or a Power Facility Inspection and Maintenance
Administration that fits into one of the situations described below is subject to a fine ranging from
NT$100,000 to NT$1,000,000 imposed by the competent authority at the level of the municipal
government or county (city) government:
1. Failing to join an appropriate trade association as required by Article 59, Paragraph 1;
2. Employing personnel whose qualifications do not meet the criteria prescribed in Article 59,
Paragraph 5 or Paragraph 6 to work in the field of electrical engineering;
3. Violating Article 62, Paragraph 1;
4. Violating Article 62, Paragraph 2 by evading, impeding or refusing to file reports, to provide
information or to accept auditing;
The Contract Electric Appliance Installer or the Power Facility Inspection and Maintenance
Administration that fits into a situation described in the preceding paragraph will be given a period
to correct the violation by the competent authority at the level of the municipal government or
county (city) government, and shall be penalized per violation when it fails to correct the violations
upon the expiration of the given period. If the violation described in Subparagraph 1 of the
preceding paragraph is of serious nature, the violator may be ordered to suspend business operation
for three to six months or have its registration revoked.
Article 85
A trade association that fails to comply with Article 59, Paragraph by refusing the Contract Electric
Appliance Installer’s or the Power Facility Inspection and Maintenance Administration’s application
for membership is subject to a fine ranging from NT$100,000 to NT$1,000,000 imposed by the
central competent authority and given a period to correct the violation. The trade association that
fails to correct the violations upon the expiration of the given period shall be punished per violation.
The person-in-charge of an industrial plant, mine field and structures and buildings for public use
utilizing electricity classified as high voltage or above violates Article 60, Paragraph 1 of this Act by
failing to employ full-time electrical technical personnel or to hire a Power Facility Inspection and
Maintenance Administration to maintain the safety of the use of electrical equipment within the
boundary lines of the electricity supply infrastructure is subject to a fine ranging from NT$100,000
to NT$1,000,000 by the central competent authority and given a period to correct the violation. The
violator that fails to correct the violations upon the expiration of the given period shall be fined per
violation and suspended to be supplied with electricity service by the Electricity Enterprises.
Article 86
The owner that installs a Self-Use Power Generation Equipment that fits into one of the situations
described below is subject to a fine ranging from NT$50,000 to $500,000 imposed by the competent
central authority and given a period to correct the violation. The owner that fails to correct the
violations upon the expiration of the given period shall be fined per violation:
1. Failing to install the Self-Use Power Generation Equipment in compliance with the rules
governing the scope, items, layout, safety issues of the electricity supply infrastructure prescribed in
Article 71 applying mutatis mutandis to Article 25, Paragraph 3;
2. Failing to supply electricity of the required voltage and frequency as prescribed in Article 71
applying mutatis mutandis to Article 26, Paragraph 1;
3. Failing to install all meters and instruments necessary as prescribed in Article 71 applying mutatis
mutandis to Article 29;
4. Failing to duly install safety devices as prescribed in Article 71 applying mutatis mutandis to
Article 30, Paragraph 1;
5. Failing to perform regular inspection and maintenance of the Self-Use Power Generation
Equipment and duly record the inspection and maintenance findings, as prescribed in Article 71
applying mutatis mutandis to Article 31, Paragraph 1;
6. Failing to install lines as prescribed in Article 71 applying mutatis mutandis to Article 37,
Paragraph 1;
7. Failing to set up an office of the directorial engineer as prescribed in Article 71 applying mutatis
mutandis to Article 58.
Article 87
A violator that fits into one of the situations described below is subject to a fine ranging from
NT$10,000 to NT$100,000 imposed by the competent authority at the level of the municipal
government or county (city) government and given a period to correct the violation. The violator
that fails to correct the violations upon the expiration of the given period shall be punished per
violation:
1. Allowing personnel whose qualifications do not meet the criteria prescribed in Article 59,
Paragraph 5 or Paragraph 6 to work in the field of electrical engineering;
2. Failing to comply with the rules governing the management of the Contract Electric Appliance
Installer and the Power Facility Inspection and Maintenance Administration as prescribed in Article
59, Paragraph 7;
3. The person-in-charge of an industrial plant, mine field and structures and buildings for public use
utilizing electricity classified as high voltage or above violating Article 60, Paragraph 1 of this Act
by failing to register or regularly file the inspection records, or violating Paragraph 2 of the same
article by failing to comply with the rules governing the record-keeping method for and
management of electrical equipment and energized facilities, management of the full-time electrical
technical personnel and other related matters;
4. The full-time electrical technical personnel violating Article 63 of this Act.
For a violator that fits into the situation described in Subparagraph 3 of the preceding paragraph, the
competent authority at the level of the municipal government or county (city) government may
work in conjunction with the Electricity Enterprises to stop electric supply to the energized facilities
where the person-in-charge fails to duly register or to file regular inspection reports.
Chapter 9 Supplementary Provisions
Article 88
The central competent authority may set up the electricity price stabilization fund to ameliorate the
impact of short-term fluctuations of the price of the electricity to the economy.
The following sources of funds may contribute to the fund prescribed in the preceding paragraph:
1. The amount of a public electricity retailer’s annual final adjusted after-tax earnings in excessive
of the reasonable profit margin;
2. Allocation of the government funds through the regular budgeting process;
3. Contribution from the Electricity Enterprises;
4. Contribution from the private enterprises;
5. Interests and dividends of the fund;
6. Other related income.
Article 89
An Electricity Generating Enterprise that has a nuclear power plant shall, during the operation
period, appropriate sufficient funds for the back-end management of nuclear power generation,
including the processing, transportation, storage and final disposal of radioactive waste,
decommissioning of the plant and the necessary community give-back measures and related
disposal costs.
The central competent authority shall stipulate the calculation formulae for the funds described in
the previous paragraph, the time limit for contribution, and the payment procedure as well as the
rules governing other related matters.
Article 90
The central competent authority may establish an electric research and testing institute as a
designated institution to engage in the studies of electricity-related technical regulations, electrical
equipment testing as well as methods to improve the reliability of the electric systems and safety of
the service.
Article 91
The central competent authority shall present the annual report on the current supply and demand of
electricity in the country, progress of the development of electricity and the status of the energy
saving and carbon reduction policy; the report shall be open for public access.
Article 92
Prior to implement of the provisions of this Act amended on January 11, 2017, an Electricity
Enterprise that have obtained the appropriate license shall apply for an appropriate license
replacement within six months after the effective date. An Electricity Enterprise that fails to apply
for replacement or applies but fails to meet the criteria set out in this Act shall have its original
license revoked and duly announced so by the electricity industry regulatory agency. A supplier that
continues its business operation despite the revocation of its license is subject to disciplinary actions
pursuant to Article 72 of this Act.
Article 93
Prior to implement of the provisions of this Act amended on January 11, 2017 an Electricity
Enterprise that engages in the generation of electricity and holds the status of a public enterprise
may retain the rights and privileges received as a public utility until the expiration of the period of
business operation allowed on the original license.
Article 94
Prior to implement of the provisions of this Act amended on January 11, 2017 any discrepancies
between an Electricity Enterprise’s guidelines and regulations for business operation written prior to
the effective date and the regulations contained in this Act shall be modified within six months after
the amendment of this Act becomes effective.
Article 95
The government shall set up a plan that actively promotes the procedure governing the final disposal
of the low-level radioactive waste in order to address the issues associated with the low-level
radioactive waste currently stored in Lanyu. The related promotion plans shall be made pursuant to
the Act on Sites for Establishment of Low Level Radioactive Waste Final Disposal Facility.
Article 96
The regulations governing electricity and other electricity-related enterprises as provided in the
Privately Owned Public Utilities Supervisory Act shall no longer be applicable prior to enforcement
of the provisions of this Act amended on January 11, 2017.
Article 97
The Act becomes effective upon promulgation unless an effective date is otherwise stipulated.
|