Legislative: |
1.Full text including 15 articles promulgated on December 31, 2020 by Ministry of Economic Affairs Order Ching-Neng-Tzu No. 10904606910;effected on January 1, 2021. |
Content: |
Article 1
These Regulations are formulated in accordance with Paragraph 4 of Article 12 of the Renewable Energy
Development Act (hereinafter referred to as “this Act”).
Article 2
The central competent authority referred to in these Regulations is the Ministry of Economic Affairs; it may
appoint the Bureau of Energy, or entrust legal persons or organizations to carry out the matters specified
from Article 3 to Article 13.
Article 3
The terms and definitions used in these Regulations are as follows:
1. Compulsory user of renewable energy: Refers to the power user who has signed electricity consumption
agreements with the electricity retailing utility enterprise, reserving capacity of more than 5,000 kW and
shall perform the obligation in accordance with Paragraphs 3 and 4 of Article 12 of this Act.
2. Chartered capacity: Refers to the regular chartered capacity of the signed electricity consumption
agreements between the power user and the electricity retailing utility enterprise in accordance with its
announced Rate Schedules.
3. Annual average chartered capacity: Refers to the chartered capacity during the annual electricity billing
period, calculated as a daily average.
4. Compulsory installed capacity: Refers to the capacity of renewable energy power generation equipment
installed by the compulsory user of renewable energy in accordance with Article 4 and Article 5.
5. Energy storage facility: Refers to a facility for power storage and power maintenance, including storage
units, power conversion facilities, and power management systems. The equipment specifications shall be
approved by the central competent authority.
The central competent authority shall review the scope of the compulsory user of renewable energy two
years after these Regulations became effective, and regularly review shall be conducted every two years
thereafter.
Article 4
The compulsory installed capacity of the compulsory user of renewable energy shall be calculated as 10% of
the average chartered capacity of the user in the previous year.
The central competent authority shall notify the compulsory user of renewable energy of the compulsory
installed capacity in accordance with the provisions of the preceding paragraph.
If two or more of the compulsory users of renewable energy are recognized as the same legal person, they
may report to the central competent authority for reviewing to jointly calculate their compulsory installed
capacity.
If the compulsory user of renewable energy has doubts about the compulsory installed capacity notified by
the central competent authority, the user may apply for correction by submitting proof documents such as
the electricity consumption agreements with the electricity retailing utility enterprise.
Article 5
If the average chartered capacity of the compulsory user of renewable energy in the previous year has
increased by more than 10% from the average chartered capacity notified by the central competent authority
previously, the authority shall increase the compulsory installed capacity of the current year in accordance
with the calculation method specified in Paragraph 1 of the preceding article and notify the compulsory user
of renewable energy.
If the average chartered capacity of the compulsory user of renewable energy in the previous year has
decreased by more than 10% from the average chartered capacity notified by the central competent authority
previously, the compulsory user of renewable energy may apply to the authority for changing the
compulsory installed capacity of the current year by submitting proof documents on chartered capacity
changes and stating the reason for such changes.
For the same legal person with the same power-use location, if the average chartered capacity of the
previous year after merging is reduced by less than 10% of the specified amount notified by the central
competent authority previously, it may not be changed.
Article 6
The compulsory user of renewable energy shall perform the obligation by setting up renewable energy
power generation equipment, purchasing renewable energy and certificate, or installing energy storage
facility within five years from January 1 of the current year when the central competent authority notifies the
compulsory installed capacity in accordance with Paragraph 2 of Article 4, or notifies the addition of the
compulsory installed capacity in accordance with Paragraph 1 of Article 5. The formula for calculating the
capacity and amount of each method to perform the obligation are as follows:
1.Installation of renewable energy power generation equipment: Calculation is based on the installed
capacity.
2. Purchase of renewable energy and certificate: The annual purchase amount required is calculated by
multiplying the compulsory installed capacity by the annual amount of electricity sales per kW for the
selected category of renewable energy (based on the annual amount of electricity sales measured in kW in
the Appendix).
3. Installation of energy storage facility: The installed capacity is calculated by multiplying the compulsory
installed capacity by the minimum power supply duration of two hours.
The capacity and purchase amount specified in the preceding paragraph are calculated based on the
renewable energy power generation equipment, authorized by the electricity license, the self-use power
generation equipment registration or the renewable energy facility registration document, the energy storage
facility approved by the central competent authority, or the purchase of renewable energy and certificate.
For those who setting up renewable energy power generation equipment by themselves, the electricity
generated shall be used by the compulsory user of renewable energy or other power user who is considered
as the same legal person.
Those who fail to perform the obligations within the time limit specified in Paragraph 1, the central
competent authority shall notify the compulsory user of renewable energy to make improvements within a
certain time limit, or perform the obligation by paying monetary substitution. The annual payment amount
of the monetary substitution is calculated by multiplying the unperformed compulsory installed capacity by
2,500 kWh /kW, and times the monetary substitution rate.
The substitute rate described in the preceding paragraph shall be announced by the central competent
authority.
Article 7
The compulsory user of renewable energy shall perform the obligation in accordance with Paragraph 1 of
the preceding Article. The compulsory installed capacity may be deducted if the following circumstances are
met:
1. For those who complete the obligations within three years, 20% of the compulsory installed capacity
notified by the central competent authority may be deducted.
2. For those who complete the obligations within four years, 10% of the compulsory installed capacity
notified by the central competent authority may be deducted.
If the compulsory user of renewable energy has installed or provided others to setting up renewable energy
power generation equipment at the power-use location before the enforcement of the Regulations, the
installed capacity of the facility may be deducted from the compulsory installed capacity notified first by the
central competent authority, and the limit is 20%.
The compulsory user of renewable energy who is applicable to the provisions of the preceding paragraph
shall provide the electricity generation license; the self-use power generation equipment registration; or the
renewable energy facility registration document, and apply to the central competent authority for approval.
Article 8
The compulsory user of renewable energy shall complete the submission of the compulsory performance
proposal before the end of March of the following year after being notified by the central competent
authority. However, this does not apply to those who have performed the obligations already.
When the compulsory user of renewable energy makes changes to the proposal described in the preceding
paragraph, the user shall prepare a comparison table, explaining the reasons for the changes, and describing
the content of the changes, which shall be submitted to the central competent authority for future reference.
The compulsory user of renewable energy shall, at the latest in the fourth year after receiving the notification
from the central competent authority, report the facility operation information for the installation of
renewable energy power generation equipment and energy storage facility in the previous year by the end of
March each year. Those who purchase renewable energy and certificate shall provide the certificate of
renewable energy and the supporting document for the power wheeling and direct supply within the validity
period of the certificate, which shall be submitted to the central competent authority for future reference.
The declaration, filing for future reference and document formats described in the preceding three
paragraphs shall be specified separately by the central competent authority.
If the compulsory user of renewable energy fails to complete the declaration and filing for future reference,
or provides incomplete information on declaration and documents for future reference as described in the
preceding three paragraphs, the central competent authority may notify the compulsory user of renewable
energy to make corrections within a time limit. If the compulsory user of renewable energy fails to make
corrections within the time limit, the central competent authority shall cancel part or all of the deducted
compulsory installed capacity described in the preceding article depending on the circumstances.
Article 9
The compulsory user of renewable energy who has set up renewable energy power generation equipment or
energy storage facility, and is unable to achieve the compulsory installed capacity within the time limit due
to equipment damage, may apply to the central competent authority for an extension of the time limit for
performing obligation. Each extension of the time limit may not exceed three months, with two extensions at
most in principle.
For the compulsory user of renewable energy who fulfills the obligation by purchasing renewable energy
and certificate, if the user is unable to achieve the compulsory installed capacity within the time limit due to
non-attributable factors, the user may make up the purchase amount by the end of February of the following
year.
Article 10
If the compulsory user of renewable energy fails to maintain the performed compulsory installed capacity,
the central competent authority shall notify the compulsory user of renewable energy to make improvements
within a time limit or pay the monetary substitution based on the unperformed compulsory installed
capacity.
If the average power generated (discharged) during the operation of renewable energy power generation
equipment or energy storage facility installed by the compulsory user of renewable energy fails to reach
80%, and has not been improved within the time limit notified by the central competent authority, the
performance results of the compulsory installed capacity shall not be included.
For the compulsory user of renewable energy who participates in ancillary services market related to the
electricity transmission and distribution enterprises with energy storage facility, the user's capacity shall not
be included in the performance results of the compulsory installed capacity.
Article 11
The central competent authority may send personnel to inspect the compulsory user of renewable energy,
and the user shall provide relevant documents or necessary assistance, and shall not evade, impede or refuse.
If the compulsory user of renewable energy evades, impedes or refuses the inspection, the central competent
authority may exclude the capacity of the corresponding equipment in the performance results of the
compulsory installed capacity.
The central competent authority shall notify the compulsory user of renewable energy in writing before
carrying out the inspection. If necessary, the central competent authority shall invite representatives of
relevant agencies (institutions), scholars and experts to jointly carry out the inspection.
Article 12
Electricity retailing utility enterprise shall, in accordance with the requirements of the central competent
authority, provide the lists, chartered capacity and relevant information required for inspection and
management in compliance with Paragraph 1 of Article 3, Article 4, Article 5, Article 7, Article 8, Article 10
and Article 11.
Article 13
The monetary substitution paid in accordance with these Regulations shall be dedicated in the Renewable
Energy Development Fund for the development of renewable energy.
The compulsory user of renewable energy who has been notified to pay the monetary substitution within a
prescribed time limit but failed to pay shall be transferred to the administrative enforcement according to
law.
Article 14
The education industry, medical care and social work service industry, transportation industry, government
agencies, fossil-fuel power station, and research agencies (institutions) established by the government in
accordance with their Acts are not applicable to these Regulations.
Article 15
These Regulations became effective on January 1, 2021.
|