Content: Article 1
These Regulations are formulated in accordance with Paragraph 4 of Article 12 of the Renewable Energy 
Development Act (hereinafter referred to as “this Act”).

Article 2
The central competent authority referred to in these Regulations is the Ministry of Economic Affairs; it may 
appoint the Bureau of Energy, or entrust legal persons or organizations to carry out the matters specified 
from Article 3 to Article 13.

Article 3
The terms and definitions used in these Regulations are as follows:
1. Compulsory user of renewable energy: Refers to the power user who has signed electricity consumption 
agreements with the electricity retailing utility enterprise, reserving capacity of more than 5,000 kW and 
shall perform the obligation in accordance with Paragraphs 3 and 4 of Article 12 of this Act.
2. Chartered capacity: Refers to the regular chartered capacity of the signed electricity consumption 
agreements between the power user and the electricity retailing utility enterprise in accordance with its 
announced Rate Schedules.
3. Annual average chartered capacity: Refers to the chartered capacity during the annual electricity billing 
period, calculated as a daily average.
4. Compulsory installed capacity: Refers to the capacity of renewable energy power generation equipment 
installed by the compulsory user of renewable energy in accordance with Article 4 and Article 5.
5. Energy storage facility: Refers to a facility for power storage and power maintenance, including storage 
units, power conversion facilities, and power management systems. The equipment specifications shall be 
approved by the central competent authority.
The central competent authority shall review the scope of the compulsory user of renewable energy two 
years after these Regulations became effective, and regularly review shall be conducted every two years 
thereafter.

Article 4
The compulsory installed capacity of the compulsory user of renewable energy shall be calculated as 10% of 
the average chartered capacity of the user in the previous year.
The central competent authority shall notify the compulsory user of renewable energy of the compulsory 
installed capacity in accordance with the provisions of the preceding paragraph.
If two or more of the compulsory users of renewable energy are recognized as the same legal person, they 
may report to the central competent authority for reviewing to jointly calculate their compulsory installed 
capacity.
If the compulsory user of renewable energy has doubts about the compulsory installed capacity notified by 
the central competent authority, the user may apply for correction by submitting proof documents such as 
the electricity consumption agreements with the electricity retailing utility enterprise.

Article 5
If the average chartered capacity of the compulsory user of renewable energy in the previous year has 
increased by more than 10% from the average chartered capacity notified by the central competent authority 
previously, the authority shall increase the compulsory installed capacity of the current year in accordance 
with the calculation method specified in Paragraph 1 of the preceding article and notify the compulsory user 
of renewable energy.
If the average chartered capacity of the compulsory user of renewable energy in the previous year has 
decreased by more than 10% from the average chartered capacity notified by the central competent authority 
previously, the compulsory user of renewable energy may apply to the authority for changing the 
compulsory installed capacity of the current year by submitting proof documents on chartered capacity 
changes and stating the reason for such changes.
For the same legal person with the same power-use location, if the average chartered capacity of the 
previous year after merging is reduced by less than 10% of the specified amount notified by the central 
competent authority previously, it may not be changed.

Article 6
The compulsory user of renewable energy shall perform the obligation by setting up renewable energy 
power generation equipment, purchasing renewable energy and certificate, or installing energy storage 
facility within five years from January 1 of the current year when the central competent authority notifies the 
compulsory installed capacity in accordance with Paragraph 2 of Article 4, or notifies the addition of the 
compulsory installed capacity in accordance with Paragraph 1 of Article 5. The formula for calculating the 
capacity and amount of each method to perform the obligation are as follows:
1.Installation of renewable energy power generation equipment: Calculation is based on the installed 
capacity.
2. Purchase of renewable energy and certificate: The annual purchase amount required is calculated by 
multiplying the compulsory installed capacity by the annual amount of electricity sales per kW for the 
selected category of renewable energy (based on the annual amount of electricity sales measured in kW in 
the Appendix).
3. Installation of energy storage facility: The installed capacity is calculated by multiplying the compulsory 
installed capacity by the minimum power supply duration of two hours.
The capacity and purchase amount specified in the preceding paragraph are calculated based on the 
renewable energy power generation equipment, authorized by the electricity license, the self-use power 
generation equipment registration or the renewable energy facility registration document, the energy storage 
facility approved by the central competent authority, or the purchase of renewable energy and certificate.
For those who setting up renewable energy power generation equipment by themselves, the electricity 
generated shall be used by the compulsory user of renewable energy or other power user who is considered 
as the same legal person.
Those who fail to perform the obligations within the time limit specified in Paragraph 1, the central 
competent authority shall notify the compulsory user of renewable energy to make improvements within a 
certain time limit, or perform the obligation by paying monetary substitution. The annual payment amount 
of the monetary substitution is calculated by multiplying the unperformed compulsory installed capacity by 
2,500 kWh /kW, and times the monetary substitution rate.
The substitute rate described in the preceding paragraph shall be announced by the central competent 
authority.

Article 7
The compulsory user of renewable energy shall perform the obligation in accordance with Paragraph 1 of 
the preceding Article. The compulsory installed capacity may be deducted if the following circumstances are 
met:
1. For those who complete the obligations within three years, 20% of the compulsory installed capacity 
notified by the central competent authority may be deducted.
2. For those who complete the obligations within four years, 10% of the compulsory installed capacity 
notified by the central competent authority may be deducted.
If the compulsory user of renewable energy has installed or provided others to setting up renewable energy 
power generation equipment at the power-use location before the enforcement of the Regulations, the 
installed capacity of the facility may be deducted from the compulsory installed capacity notified first by the 
central competent authority, and the limit is 20%.
The compulsory user of renewable energy who is applicable to the provisions of the preceding paragraph 
shall provide the electricity generation license; the self-use power generation equipment registration; or the 
renewable energy facility registration document, and apply to the central competent authority for approval.

Article 8
The compulsory user of renewable energy shall complete the submission of the compulsory performance 
proposal before the end of March of the following year after being notified by the central competent 
authority. However, this does not apply to those who have performed the obligations already.
When the compulsory user of renewable energy makes changes to the proposal described in the preceding 
paragraph, the user shall prepare a comparison table, explaining the reasons for the changes, and describing 
the content of the changes, which shall be submitted to the central competent authority for future reference.
The compulsory user of renewable energy shall, at the latest in the fourth year after receiving the notification 
from the central competent authority, report the facility operation information for the installation of 
renewable energy power generation equipment and energy storage facility in the previous year by the end of 
March each year. Those who purchase renewable energy and certificate shall provide the certificate of 
renewable energy and the supporting document for the power wheeling and direct supply within the validity 
period of the certificate, which shall be submitted to the central competent authority for future reference.
The declaration, filing for future reference and document formats described in the preceding three 
paragraphs shall be specified separately by the central competent authority.
If the compulsory user of renewable energy fails to complete the declaration and filing for future reference, 
or provides incomplete information on declaration and documents for future reference as described in the 
preceding three paragraphs, the central competent authority may notify the compulsory user of renewable 
energy to make corrections within a time limit. If the compulsory user of renewable energy fails to make 
corrections within the time limit, the central competent authority shall cancel part or all of the deducted 
compulsory installed capacity described in the preceding article depending on the circumstances.

Article 9
The compulsory user of renewable energy who has set up renewable energy power generation equipment or 
energy storage facility, and is unable to achieve the compulsory installed capacity within the time limit due 
to equipment damage, may apply to the central competent authority for an extension of the time limit for 
performing obligation. Each extension of the time limit may not exceed three months, with two extensions at 
most in principle.
For the compulsory user of renewable energy who fulfills the obligation by purchasing renewable energy 
and certificate, if the user is unable to achieve the compulsory installed capacity within the time limit due to 
non-attributable factors, the user may make up the purchase amount by the end of February of the following 
year.

Article 10
If the compulsory user of renewable energy fails to maintain the performed compulsory installed capacity, 
the central competent authority shall notify the compulsory user of renewable energy to make improvements 
within a time limit or pay the monetary substitution based on the unperformed compulsory installed 
capacity.
If the average power generated (discharged) during the operation of renewable energy power generation 
equipment or energy storage facility installed by the compulsory user of renewable energy fails to reach 
80%, and has not been improved within the time limit notified by the central competent authority, the 
performance results of the compulsory installed capacity shall not be included.
For the compulsory user of renewable energy who participates in ancillary services market related to the 
electricity transmission and distribution enterprises with energy storage facility, the user's capacity shall not 
be included in the performance results of the compulsory installed capacity.

Article 11
The central competent authority may send personnel to inspect the compulsory user of renewable energy, 
and the user shall provide relevant documents or necessary assistance, and shall not evade, impede or refuse. 
If the compulsory user of renewable energy evades, impedes or refuses the inspection, the central competent 
authority may exclude the capacity of the corresponding equipment in the performance results of the 
compulsory installed capacity.
The central competent authority shall notify the compulsory user of renewable energy in writing before 
carrying out the inspection. If necessary, the central competent authority shall invite representatives of 
relevant agencies (institutions), scholars and experts to jointly carry out the inspection.

Article 12
Electricity retailing utility enterprise shall, in accordance with the requirements of the central competent 
authority, provide the lists, chartered capacity and relevant information required for inspection and 
management in compliance with Paragraph 1 of Article 3, Article 4, Article 5, Article 7, Article 8, Article 10 
and Article 11.

Article 13
The monetary substitution paid in accordance with these Regulations shall be dedicated in the Renewable 
Energy Development Fund for the development of renewable energy.
The compulsory user of renewable energy who has been notified to pay the monetary substitution within a 
prescribed time limit but failed to pay shall be transferred to the administrative enforcement according to 
law.

Article 14
The education industry, medical care and social work service industry, transportation industry, government 
agencies, fossil-fuel power station, and research agencies (institutions) established by the government in 
accordance with their Acts are not applicable to these Regulations.

Article 15
These Regulations became effective on January 1, 2021.